1 / 58

History of Project Management

History of Project Management. Farrokh Alemi, Ph.D. Lee Baliton Chris Smith. Ancient History. Examples: The Great Pyramids of Giza (2,550 B.C.) The Great Wall of China (221 B.C. - 206 B.C.) Exceptional planning Coordination Allocation Hundreds of thousands of workers

Download Presentation

History of Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. History of Project Management Farrokh Alemi, Ph.D.Lee Baliton Chris Smith

  2. Ancient History • Examples: • The Great Pyramids of Giza (2,550 B.C.) • The Great Wall of China (221 B.C. - 206 B.C.) • Exceptional planning • Coordination • Allocation • Hundreds of thousands of workers • Paid and Slave labor.

  3. Ancient History • Examples of ancient projects: The Great Pyramids of Giza (2,550 B.C.) and the Great Wall of China (221 B.C. - 206 B.C.) • Exceptional planning • Coordination • Allocation • Hundreds of thousands of workers • Paid and Slave labor.

  4. Ancient History • Examples of ancient projects: The Great Pyramids of Giza (2,550 B.C.) and the Great Wall of China (221 B.C. - 206 B.C.) • Exceptional planning • Coordination • Allocation • Hundreds of thousands of workers • Paid and Slave labor.

  5. Ancient History • Examples of ancient projects: The Great Pyramids of Giza (2,550 B.C.) and the Great Wall of China (221 B.C. - 206 B.C.) • Exceptional planning • Coordination • Allocation • Hundreds of thousands of workers • Paid and Slave labor.

  6. Ancient History • Examples of ancient projects: The Great Pyramids of Giza (2,550 B.C.) and the Great Wall of China (221 B.C. - 206 B.C.) • Exceptional planning • Coordination • Allocation • Hundreds of thousands of workers • Paid and Slave labor.

  7. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  8. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  9. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  10. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  11. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  12. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling

  13. Ancient History • Similar basic elements of project management: • Managing resources • Maintaining a schedule • Coordinating different groups • All are used in today’s modern project management practice • No evidence that they used optimal scheduling Project Management was not really the same

  14. The Early Years: Late 19th Century • PM emerged in the growing complexity of commerce • Seen in transportation, to manufacturing • Large scale projects caused large scale management decisions. • Example is the 1862 Transcontinental Railroad

  15. The Early Years: Late 19th Century • PM emerged in the growing complexity of commerce • Seen in transportation, to manufacturing • Large scale projects • Example is the 1862 Transcontinental Railroad

  16. The Early Years: Late 19th Century • PM emerged in the growing complexity of commerce • Seen in transportation, to manufacturing • Large scale projects • Example is the 1862 Transcontinental Railroad

  17. The Early Years: Transcontinental Railroad • First large scale project management • Officially started after President Lincoln signed the Pacific Railroad Act • Authorized to build a railway and a telegraph line • Granted funding and land • Union Pacific to build west from Omaha, NE; Central Pacific east from Sacramento, CA

  18. The Early Years: Transcontinental Railroad • The Transcontinental Railroad considered first large scale project management • President Lincoln signed the Pacific Railroad Act • Authorized to build a railway and a telegraph line • Granted funding and land • Union Pacific to build west from Omaha, NE; Central Pacific east from Sacramento, CA

  19. The Early Years: Transcontinental Railroad • The Transcontinental Railroad considered first large scale project management • President Lincoln signed the Pacific Railroad Act • Railway • Telegraph line • Granted funding and land • Union Pacific to build west from Omaha, NE; Central Pacific east from Sacramento, CA

  20. The Early Years: Transcontinental Railroad • The Transcontinental Railroad considered first large scale project management • Officially started after President Lincoln signed the Pacific Railroad Act • Authorized to build a railway and a telegraph line • Granted funding and land • Union Pacific to build west from Omaha, NE; Central Pacific east from Sacramento, CA

  21. The Early Years: Transcontinental Railroad • The Transcontinental Railroad considered first large scale project management • Officially started after President Lincoln signed the Pacific Railroad Act • Authorized to build a railway and a telegraph line • Granted funding and land • Union Pacific • Central Pacific

  22. The Early Years: Transcontinental Railroad Source: Wikipedia: Theodore Judah http://en.wikipedia.org/wiki/Theodore_Judah

  23. The Early Years: Late 19th Century • Mid-19th century business leaders faced with task of organizing labor in manufacturing and assembly

  24. The Early Years: Late 19th Century • Mid-19th century business leaders faced with task of organizing labor in manufacturing and assembly Coffee break before and now

  25. Modern Project Management 1900-1950 – Henry Gantt • Modern project management • Construction • Engineering • Defense • Henry Gantt forefather of project management • Known for planning and control techniques • “Gantt” chart keeps track of project schedule.

  26. Modern Project Management 1900-1950 – Henry Gantt • Modern project management came from construction, engineering, and defense • Henry Gantt forefather of project management • Known for planning and control techniques • “Gantt” chart keeps track of project schedule. Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  27. Modern Project Management 1900-1950 – Henry Gantt • Modern project management came from construction, engineering, and defense • Henry Gantt forefather of project management • Known for planning and control techniques • “Gantt” chart keeps track of project schedule. Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  28. Modern Project Management 1900-1950 – Gantt chart Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  29. Modern Project Management 1900-1950 – Gantt chart Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  30. Modern Project Management 1900-1950 – Gantt chart Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  31. Modern Project Management 1900-1950 – Gantt chart Source Gantt Charts at http://www.ganttchart.com/Evolution.html

  32. Modern Project Management 1900-1950 – Frederic Taylor • Work breakdown • Piecemeal work Source: Fredrick Taylor entry in Wikipedia http://en.wikipedia.org/wiki/Frederick_Winslow_Taylor

  33. Modern Project Management 1900-1950 – Frederic Taylor Source: Fredrick Taylor entry in Wikipedia http://en.wikipedia.org/wiki/Frederick_Winslow_Taylor

  34. Modern Project Management 1950 and beyond • Pre-1950’s ad-hoc project management • Gantt charts and other informal techniques were used • Early 1950’s modern project management

  35. Modern Project Management 1950 and beyond • Pre-1950’s ad-hoc project management • Gantt charts and other informal techniques were used • Early 1950’s modern project management

  36. Modern Project Management 1950 and beyond • Pre-1950’s ad-hoc project management • Gantt charts and other informal techniques were used • Early 1950’s modern project management

  37. Modern Project Management 1950 and beyond - PERT • Two mathematical scheduling methods • “Program Evaluation Review Technique” or PERT • Analyzes the tasks • Identifies minimum amount of time

  38. Modern Project Management 1950 and beyond - PERT • Two mathematical scheduling methods • “Program Evaluation Review Technique” or PERT • Analyzes the tasks • Identifies minimum amount of time Edwin Booz Source: The Story of Consulting: 1920-1939 http://www.agcon.com/HTML/site_content/page_episode_2_en.html

  39. Modern Project Management 1950 and beyond - PERT • Two mathematical scheduling methods • “Program Evaluation Review Technique” or PERT • Analyzes the tasks • Identifies minimum amount of time Edwin Booz Source: The Story of Consulting: 1920-1939 http://www.agcon.com/HTML/site_content/page_episode_2_en.html

  40. Modern Project Management 1950 and beyond - PERT Source: Wikipedia http://en.wikipedia.org/w/index.php?title=Image%3APert_chart_colored.gif

  41. Modern Project Management 1950 and beyond - PERT Source: Wikipedia http://en.wikipedia.org/w/index.php?title=Image%3APert_chart_colored.gif

  42. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • A CPM diagram based on the following project elements: • List of all activities required for project • Length of time for each activity • Dependencies between the activities.

  43. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • A CPM diagram based on the following project elements: • List of all activities required for project • Length of time for each activity • Dependencies between the activities.

  44. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • CPM diagram • List of all activities required for project • Length of time for each activity • Dependencies between the activities.

  45. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • CPM diagram • List of all activities required for project • Length of time for each activity • Dependencies between the activities.

  46. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • CPM diagram • List of all activities required for project • Length of time for each activity • Dependencies among the activities

  47. Modern Project Management 1950 and beyond - CPM • The “Critical Path Method” developed for plant maintenance projects • Algorithm for scheduling project activities. • A CPM diagram based on the following project elements: • List of all activities required for project • Length of time for each activity • Dependencies among the activities

  48. Modern Project Management 1950 and beyond - CPM • CPM diagram of a construction project

  49. Modern Project Management 1950 and beyond - CPM The blue arrows are tasks that consume resources

  50. Modern Project Management 1950 and beyond - CPM The blue arrows also have the time required to complete each task

More Related