1 / 26

TIB System Test Report

TIB System Test Report. Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System Test Setup (TIB) Results from the TIB System Test. TIB system test (July 2002). Not only for PS but “evolving” into a fully fledged mechanical and electrical test

phoebe
Download Presentation

TIB System Test Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIB System Test Report • Where were we ….., • Mechanics (layer 3 prototype) • Mother Cable & Interconnect Board • System Test Setup (TIB) • Results from the TIB System Test System Test Status Report R. D’Alessandro

  2. TIB system test (July 2002) • Not only for PS but “evolving” into a fully fledged mechanical and electrical test • NEEDS optical decoupling to achieve meaningful results • At first we needed a relatively good understanding of an optical system compared to a copper one: • Many measurements made, we gained full confidence. • Thanks to Roberto Cecchi for TIST. System Test Status Report R. D’Alessandro

  3. La bara DOH CCU25 Power distribution PCB System Test Status Report R. D’Alessandro

  4. Brico & Flexibility Short distance APV-AOH Final Kapton cable could be even shorter than this one Input/Output temporary connections on the back of module carrier System Test Status Report R. D’Alessandro

  5. Mechanics Prepared by Pisa Layer 3 mock-up Up to 4 cooling loops (12 modules) Final dimensions System Test Status Report R. D’Alessandro

  6. Mother Cable (1) System Test Status Report R. D’Alessandro

  7. Mother cable (2) System Test Status Report R. D’Alessandro

  8. Interconnect board Connects up to 4 MC Redundancy implemented Distributes also LV and HV Jumper disable of Hard Reset System Test Status Report R. D’Alessandro

  9. What went on the mechanical structure • 3 modules: 180, 168, 177 (14 APV25) • 3 Analog OptoHybrids (3 fibres each) • 50 Ohms termination (100 Ohms in the future) • 1 CCU25 + DOH + Interconnect Board • Mother Cable with slight mods. • Power: Caen (counting room) prototype • 150 m cable LIC (100m Outer + 50m Inner) • 40 uF TOTAL LOAD CAPACITORS! • Battery for the control loop (5V for the DOH) System Test Status Report R. D’Alessandro

  10. Cables System Test Status Report R. D’Alessandro

  11. 3Modules (complete MC) Fibre SPAGHETTI! CCU25 DLink AOH Cooling loops System Test Status Report R. D’Alessandro

  12. Results • Bias = 200 V on 3 modules simultaneously • <1 microA total for the 3 modules • HV test with 1 module to 300V, on MC without modules to 450V • Able to read out pedestals and noise on all 3 modules at the same time • Calibration one module at a time System Test Status Report R. D’Alessandro

  13. Pedestals ADC value peak ADC value deconv Strip no. Strip no. System Test Status Report R. D’Alessandro

  14. Common mode noise 200V bias non-inv, peak Module 177 Module 180 ADC channels ADC channels System Test Status Report R. D’Alessandro

  15. TIB System test in Florence Analog opto hybrid 50nF cap 22kW Bias line System Test Status Report R. D’Alessandro

  16. New TIB hybrid layout (Dec. 2002 v11) Bias ring DCU input From J.D. Berst System Test Status Report R. D’Alessandro

  17. TIB HV 300V on ARC Peak-Inverter on First and last strips~12ADC counts 2 noisy neighbours Unbonded strips System Test Status Report R. D’Alessandro

  18. Same module but with 50nF capacitor to ground Edge effect reduced Furthermore only one strip is now affected …also the common mode is reduced System Test Status Report R. D’Alessandro

  19. Same module on sys-test Module 177 with cap Peak mode Module 180 without cap System Test Status Report R. D’Alessandro

  20. Signal shapes ADC value ADC value ns ns System Test Status Report R. D’Alessandro

  21. Noise distribution (1) Peak mode Noise very low CMN is lower still S/N ratio Peak ~ 65 Ical=80! ADC channels System Test Status Report R. D’Alessandro

  22. Noise distribution (2) Deconv mode S/N ratio Deconv ~ 52 Ical=80! ADC channels System Test Status Report R. D’Alessandro

  23. LV behaviour Noise on 2.5V line 2.5V HARD RES (14 APVs + 9 Lasers) 10 mV/div 20 us/div DV=280 mV 200 mV/div 200 us/div System Test Status Report R. D’Alessandro

  24. Conclusions • So far we have witnessed an excellent behaviour of the system. • Mother Cable is very well thought out, signals are clean, voltage drops negligeable. (Thanks to Giuseppe De Robertis) • The interconnect board has delivered at first go. (Thanks to Roberto Ciaranfi) • This Pisa-Florence common endeavour is getting along fine (incredible though this might seem) System Test Status Report R. D’Alessandro

  25. Future • Need to go to 4 strings (12 modules) • MC are being loaded with components • Test redundancy (2nd DOH and CCU25s from CERN) • AOHs will be modified (100 Ohms) • We have started Xdaq migration. • This mock-up will be upgraded, while a new one is under construction ready for the next MC type. • New MC being designed (final version …) • DOM (DOH carrier) design underway System Test Status Report R. D’Alessandro

  26. Interconnect Board (redundancy is implemented) System Test Status Report R. D’Alessandro