1 / 21

Search for 7-prong  Decays

Search for 7-prong  Decays. Ruben Ter-Antonyan on behalf of the BaBar Collaboration Tau04 Workshop, Sep 14, 2004, Nara, Japan. Outline: Introduction Event Selection Data - Monte Carlo Comparison Background Estimate Systematic Uncertainties Preliminary Results.

phuc
Download Presentation

Search for 7-prong  Decays

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Search for 7-prong  Decays Ruben Ter-Antonyan on behalf of the BaBar Collaboration Tau04 Workshop, Sep 14, 2004, Nara, Japan Outline: • Introduction • Event Selection • Data - Monte Carlo Comparison • Background Estimate • Systematic Uncertainties • Preliminary Results

  2. BaBar and  Physics 1.5 T Solenoid Electromagnetic Calorimeter (EMC) Detector of Internally Recflected Cherenkov Light (DIRC) e+ (3.1 GeV) PEP-II Delivered 253 fb-1 BaBar Recorded 244 fb-1 e- (9 GeV) Drift Chamber (DCH) Instrumented Flux Return (IFR) Silicon Vertex Tracker (SVT) BaBar is a great place for t physics! • s(e+ e- t+ t-) = 0.89 nb at 10.58 GeV • Recorded luminosity: 244 fb-1 220 million t pairs! • Analyzed luminosity:124.3 fb-1  110 million t pairs

  3. 7-prong t decays Very rare – no observation to date. e+ ttag • Experiment: • BR(t  7p(p0)nt )< 2.4  10-6 • (CLEO, 1997, PRD 56, 5297) • Theory: • BR(t  7p(p0)nt ) < 6  10-11 (assuming no substructure) • (S. Nussinov, M. Purohit, 2002, PRD 65) • Motivation: • With 25 times CLEO’s statistics we hope for a first observation • More stringent bound on the t neutrino mass if the decay is observed • Search for possible substructure in decay products. trec e- MC 1-7 event 1-prong side 7-prong side

  4. MC Studies of Signal and Background • Signal 7p(p0)nt: • generated using phase space • Background: • generic t: -- generated using TAUOLA - biggest contribution from 5pp0ntmode (g - conversions) • hadronic: uds, cc, bb -- continuum qq simulated with JETSET • Bhabha, m-pair, 2-photon: negligible BABAR preliminary Mass (GeV/c2) Signal region Analysis proceeds “blinded”: events below 2 GeV/c2 are removed from the data.

  5. Pseudo-Mass MC 7-prong Invariant and Pseudo-Mass • Pseudo-mass was introduced by ARGUS in 1992 to measure the t-lepton mass. • Assume neutrino is mass-less and takes zero energy • t direction is approximated by 7 ch. tracks • m*t2=2(Ebeam – E7p)(E7p – P7p)+m7p2 BABAR preliminary Events / 0.005 GeV/c2 Mass (GeV/c2) Advantage of pseudo-mass: • Sharp cut-off at the t mass (1.777 GeV/c2). • significant improvement of signal-background separation BABAR preliminary BABAR preliminary Events / 0.01 GeV/c2 Events / 0.01 GeV/c2 BR=2.4×10-6 All plots on this slide show Monte Carlo simulated events Invariant Mass (GeV/c2) Pseudo-Mass (GeV/c2)

  6. Event Selection • Pre-Selection: • Up to 10 charged tracks and 12 neutrals in event • Thrust magnitude > 0.90 • Reject g-conversions • Select 8 “good” tracks in event: • distance of closest approach to the beam spot in XY-plane DOCAXY < 1.5 cm • distance of closest approach to the beam spot in Z-plane DOCAZ < 10 cm • 5 tracks with ≥12 drift chamber hits and transverse momentum pT >100 MeV/c • Topology cut: event is divided into two hemispheres perpendicular to thrust axis with 1 “good” track recoiling against 7“good” tracks and zero net charge • Event and 7-prong cuts: • Thrust magnitude > 0.93 • Particle ID for p-mesons • pT >100 MeV/c • DOCAXY / pT < 0.7cmc/GeV 1-prong tags: electron ID + 0 or 1g muon ID + 0 or 1g r, 0g h,0g 1.3 < Pseudo-Mass (7-prong) < 1.8 GeV/c2

  7. Data-MC comparison • Quantitative disagreement between data and MC throughout the analysis • Data after all cuts contain 5 times larger sample of qq events than MC simulation predicts MC simulated qq events will not be used for bkg. estimate in data. BABAR preliminary Events / 0.025 GeV/c2 signal region Pseudo-Mass (GeV/c2) • Both data and MC have smooth pseudo-mass distributions • Both can be fitted with a Gaussian function MC simulated qq events will be used as a check of bkg. estimate method. MC qq is scaled to data qq above 2 GeV/c2. Background from t events is small and is determined from MC. Data above 2 GeV/c2 will be used to estimate qq bkg. in signal region

  8. Background Estimate Scenario DATA After thrust cut DATA After all cuts fit BABAR preliminary m, s Events / 0.025 GeV/c2 Events / 0.025 GeV/c2 extrapolate integrate Pseudo-Mass (GeV/c2) Pseudo-Mass (GeV/c2) BABAR preliminary Mean • Fit from 2 to 2.5 GeV/c2 after thrust cut with a Gaussian function • Extrapolate the fit below 2 GeV/c2 • Integrate from 1.3 to 1.8 GeV/c2 Sigma • Use these fit parameters on the pseudo-mass spectrum after all cuts. Mean and sigma do not vary significantly after thrust cut. thrust cut Cuts

  9. Background Estimate Validation: MC Pre-selection Thrust cut • MC Hadronic Bkg. (75 fb-1) • Pseudo-mass is fitted after thrust cut and fit parameters are used for bkg. estimate after each cut. • Good agreement between expected and observed number of bkg. events throughout the cuts. • After all cuts (1.3-1.8 GeV/c2): -- expected: 1.8 ± 0.7 -- observed: 1 7-prong p ID PT cut Events / 0.025 GeV/c2 DOCAXY/ PT cut 1-prong tags BABAR preliminary Pseudo-Mass (GeV/c2) Pseudo-Mass (GeV/c2)

  10. Background Estimate Validation: 1-8 data 1-8 Data after thrust cut 1-8 Data after all cuts BABAR preliminary BABAR preliminary Events / 0.025 GeV/c2 Events / 0.025 GeV/c2 Pseudo-Mass (GeV/c2) Pseudo-Mass (GeV/c2) • 1-8 Topology Data. (91 fb-1) • Pure hadronic bkg. • Good agreement between expected and observed number of bkg. events in the signal region throughout the cuts. B A B A Rp r e l i m i n a r y

  11. Preliminary Results After thrust cut After all cuts BABAR preliminary BABAR preliminary Events / 0.025 GeV/c2 Events / 0.025 GeV/c2 extrapolation of fit signal region Pseudo-Mass (GeV/c2) Pseudo-Mass (GeV/c2) Signal efficiency: -- 7pnt mode: 8.05% -- 7pp0ntmode: 8.04% Events in signal region -- expected bkg.: 11.9 ± 2.2 -- observed: 7 No evidence for signal !

  12. Systematic Uncertainties Signal Efficiency (both modes have equivalent uncertainties) Tracking efficiency 5.2 % Particle ID 2.7 % 1-prong generic t BR 0.5 % Limited MC statistics 2.6 % Luminosity and t+t- cross-section 2.3 % tbackground Limited t MC statistics (3 events out of 621 fb-1) 58 % 5pp0nt branching ratio 15 % qq background Fit parameters (%) 18 % Fit range (%) 3 % Num. events fitted (%) 4 % Total uncertainty of signal efficiency (%) 6.8% B A B A R p r e l i m i n a r y Total uncertainty of t background (%) 60% Total uncertainty of qq background (%) 19%

  13. Preliminary Upper Limit N t+t- 1.1 × 108 t+t- background 0.6 ± 0.4 qq background 11.3 ± 2.2 Total expected background 11.9 ± 2.2 t- 4p- 3p+ nt efficiency (8.05 ± 0.55) % t- 4p- 3p+ p0 nt efficiency (8.04 ± 0.55) % B A B A R p r e l i m i n a r y using most conservative Bayesian approach BR (t- 4p- 3p+ (p0)nt ) @ 90% CL < 2.7 × 10-7 Experiment CLEO (1997) BaBar Luminosity (fb-1) 4.6 124.3 Observed (predicted) events 0 (2.8) 7 (11.9) BR (t- 4p- 3p+ (p0)nt ) @ 90% CL < 2.4 × 10-6 < 2.7 × 10-7

  14. Summary • Pseudo-mass is a powerful tool for reducing qq background in the signal region • Hadronic background estimate completely done from data • No evidence for t- 4p- 3p+ (p0) nt found; BR upper limit is 10 times better than previously set • Will finalize the analysis with doubled statistics soon.

  15. Backup Slides

  16. 1-7 Topology Event A typical example of a MC simulated 1-7 event: on the left plot 8 tracks are counted, but the right plot shows where the 1 additional track comes from.

  17. Looper and Photon Conversion Rejection • Looper candidate: • A pair of tracks with SVT hits • pT,LAB < 200 MeV/c for each track • |cosLAB| < 0.18 for each track • |DpT,LAB| < 100 MeV/c Remove tracks with largest DOCAZ • Photon Conversion candidate: • A pair of tracks with invariant mass < 5 MeV • Distance between tracks in XY-plane < 0.2 cm

  18. Efficiency of the Cuts Events in signal region8.1% 8.3% 0 0 1.6 0 BABAR preliminary • After pre-selection background is always dominated by qq events. • 7-prong cuts suppress the background from generic t events. • Background from qq is suppressed after tagging the 1-prong and the pseudo-mass cut.

  19. Data-MC Comparison Data/MC ratio for various topologies • Quantitative data-MC disagreement increasing with cuts for multi-prong events. • Domination of qq bkg. in multi-prong events, resulting in worse data-MC agreement. MC simulation of qq in 1-7 topology does not agree with data. • MC simulation of t events is reliable for an estimate. 85 68 3.8 0.59 0.37 BABAR preliminary 0.03 Numbers show MC simulated qq/t ratio for different topologies.

  20. Background Estimate Validation • 1-7 MC: expected and observed qq bkg. in the region (1.3-1.8) GeV/c2 • 1-8 Data: expected and observed events in the region (1.3-2.0) GeV/c2 • 1-7 Data: expected background (t and qq) in the region (1.3-1.8) GeV/c2 -- t bkg. is estimated using Monte Carlo simulation -- qq bkg. is estimated from the fits Cuts1-7 MC1-8 Data1-7 Data exp. obs. exp. obs. exp. obs. Thrust mag. 89 ± 34 9541 ± 10 57 257 ± 36 298 7-prong p ID 33 ± 11 29 29 ± 7 32 108 ± 18 98 7-prong pT 22 ± 8 23 19 ± 5 22 83 ± 14 79 DOCAXY/pT 10 ± 4 15 7.7 ± 2.3 8 47 ± 9 40 1-prong tag 1.8 ± 0.7 1 2.0 ± 0.6 1 11.9 ± 2.2 7 B A B A R p r e l i m i n a r y The agreement is quite good!

  21. Upper Limit Calculation with Errors To obtain the BR upper limit calculation incorporating uncertainties, we integrate the Likelihood function of the experiment: n – number of events observed, sampled from Poisson, m= <n> = f B + b b - number of bkg. expected, b* sample from normal N(b, sb) f = 2 Ntt e, f* sample from normal N(f, sf)

More Related