An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Public Input Meeting April 16, 2012

  2. Meeting Schedule • Housekeeping • Meeting Schedule • Open House – 6:00-6:30 pm • Presentation – 6:30-7:00 pm • Q&A – 7:00-7:30 pm • Open House – 7:30-8:30 pm

  3. Introductions • U.S. Army Corps of Engineers • Metro Parks • Mayor’s Office • Metro Council District Representatives • HDR Engineering, Inc. • Corn Island Archaeology • Redwing Ecological Services

  4. Study Purpose This Study Will……. • Evaluate Routes for a Conceptual Shared-Use Path • National Turnpike at Fairdale Road to Floyds Fork at Bardstown Road • Provide a Recommended Alignment for the Louisville Loop • Identify Potential Ecological Restoration Opportunities • Pond Creek Watershed • Floyds Fork Watershed

  5. Meeting Purpose • Louisville Loop Summary • Other projects in and around Study Area • Describe the intent of this Study • Gain input on potential trail route variations • Gain input on natural and socio-economic resources in the study area • Outline future steps of the planning process

  6. Louisville Loop Summary

  7. Louisville Loop Summary

  8. RiverWalk and Levee Trail

  9. Ohio River Levee Trail Extension Louisville Loop from Farnsley-Moremen to Watson Lane

  10. Scoop on the Loop Loop Related Projects • CDC Wayfinding and Signage Master Plan • Louisville Loop Design Guidelines • Southwest Greenways Master Plan • Olmsted Parkways

  11. 21st Century Parks - Floyds Fork

  12. Floyds Fork Broad Run Park

  13. Pond Creek Corridor

  14. Scoop on the Loop Projects around the Loop • National Turnpike widening from Fairdale Rd. to S. Park Rd. • Mt. Holly Rd. Widening • Blue Lick Road widening from I-265 to Preston Hwy. • Interchange improvements at I-265 and Preston Hwy. • Preston Hwy. intersection improvements at Commerce Crossing/Cooper Chapel • Cooper Chapel Rd. Section I • Cooper Chapel Rd. Section III • Beulah Church Rd. widening • Mt. Washington Rd. Section I • Mt. Washington Rd Section II • McNeely Lake Park Master Plan • McNeely Lake Park Access Improvements

  15. National Turnpike / Mt. Holly Rd

  16. Blue Lick Rd, Preston/I-265 Interchange, Commerce/Preston/Cooper Chapel

  17. Cooper Chapel Rd. Section I

  18. Cooper Chapel Rd. Section III & Beulah Church Road widening

  19. Mt. Washington Rd, Section I and II

  20. McNeely Lake Park Master Plan

  21. McNeely Lake Park Master Plan

  22. Project Overview Provide a conceptual shared-use path and ecological restoration plan from Fairdale to Floyds Fork

  23. Evaluate Existing Conditions • Cultural, Historical, Archaeological Resources • Rights of Way • Land Use • Land Ownership • Physical Barriers – Streams, Roads, Railroad • Utilities • Topography

  24. Trail Alignment Concept • A planned paved and shared-use recreational trail that will serve as a major recreational and transportation feature for the nearby community and region. Trail uses will include walking, biking, hiking, and horseback riding. • Trail variations • Trailheads with parking • Pedestrian, bike, and transit access points to neighborhoods, parks, community facilities and schools

  25. Louisville Loop Standards

  26. Economic Environment Social Environment Physical Environment Natural Environment The Approach: Four Fundamental Elements

  27. Process - Segments

  28. Process – Alternative Alignments

  29. Process – Preferred Alignment

  30. Background – Previous Studies 2008 – Pond and Mill Creek Feasibility Study

  31. Background – Previous Studies 2008 – Pond and Mill Creek Feasibility Study

  32. Ecological Restoration • Along tributaries of Pond Creek and Floyds Fork • Categorize functional benefits to the natural and human environments.

  33. Future Participation Opportunities • Preliminary Plan Development (segments) • Preliminary Plan (alignments) • Preliminary Final Plan (recommended alignment)

  34. QUESTIONS?