80 likes | 227 Views
Kakatiya 1x600 MW Generator Stator Lifting on 11.06.2014. Kakatiya Thermal Power Project 1x600 MW . Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting. . Kakatiya Thermal Power Project 1x600 MW .
E N D
Kakatiya 1x600 MW Generator Stator Lifting on 11.06.2014
Kakatiya Thermal Power Project 1x600 MW Shri Shiva Kumar Chief Engineer / KTPP TGGENCO breaking coconut on the occasion of Stator Lifting.
Kakatiya Thermal Power Project 1x600 MW Shri M V Keshavraj AGM BHEL Site breaking coconut on the occasion of Stator Lifting.
Kakatiya Thermal Power Project 1x600 MW Lifting of Generator Stator commenced at 0940 Hrs.
Kakatiya Thermal Power Project 1x600 MW Stator Lifting under progress.
Kakatiya Thermal Power Project 1x600 MW Stator entering TG floor.
Kakatiya Thermal Power Project 1x600 MW Stator Placed on Pedestals at 1100 Hrs
Kakatiya Thermal Power Project 1x600 MW TGGENCO officials along with BHEL staff after Stator Lifting