1 / 89

10 Urban Drainage

Technische Universität Dresden. Peter Krebs. Department of Hydro Science, Institute for Urban Water Management. Urban Water Systems. 10 Urban Drainage. 10.1 Rain characterisation 10.2 Rain-runoff process 10.3 Sewer structure elements 10.4 Stormwater concepts. 10 Urban drainage.

pmangino
Download Presentation

10 Urban Drainage

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technische Universität Dresden Peter Krebs Department of Hydro Science, Institute for Urban Water Management Urban Water Systems 10 Urban Drainage 10.1 Rain characterisation 10.2 Rain-runoff process 10.3 Sewer structure elements 10.4 Stormwater concepts 10 Urban drainage

  2. 10 Urban drainage 10.1 Rain characterisation 10 Urban drainage

  3. Rain-runoff process Rain  Runoff Not predictable Can be analysed statistically Affected by systematic changes Cannot be analysed statistically Models Measurements Dimensioning 10 Urban drainage

  4. Significance of stormwater • Stormwater runoff  decisive for pipe diameter • Contaminated after surface runoff • Sewage overflow due to stormwater runoff • Erosion of sewer sediments • WWTP operation is disturbed for longer than the rain duration 10 Urban drainage

  5. Rain measurement Syphon Weighing Tipping bucket 10 Urban drainage

  6. Description of rain events Intense event Long duration event From Dyck and Peschke (1989) 10 Urban drainage

  7. Rain measurement Defined opening area of 200 cm2 Normalised shape in vertical section Measurement error depending on Wind velocity field Rain or snow Wind protection shield 10 Urban drainage

  8. Description of rain (precipitation) Rain height hR in mm Rain duration tR in min Rain intensity in mm/min, l/(s·ha), m/s Rain intensity r Area = hR Block rain Time t tR 10 Urban drainage

  9. Resolution in time r (l/(s·ha)) r (l/(s·ha)) Time (min) Time (min) 10 Urban drainage

  10. Resolution in time  Runoff 10 Urban drainage

  11. Resolution in time  retention volume Retention volume in m3 Date of rain event t = 5 min t = 10 min 29.08.1964 1890 1886 07.07.1965 1792 1772 17.07.1963 1232 1225 19.05.1964 1089 1075 From Krejci et al. (1994) 10 Urban drainage

  12. Resolution in space 10 Urban drainage

  13. Assignment of rain gauges to sub-catchments Thiessen-Polygon (from Dracos, 1980) 10 Urban drainage

  14. Extreme value frequency (Reinhold, 1940) 10 Urban drainage

  15. Reference rain intensity r15(1) in l/(s·ha) Baden-Baden 120 Berlin 94 Bonn 108 Bremen 108 Dortmund 120 Dresden 102 Essen 96 Flensburg 100 Frankfurt/Main 120 Garmisch-Patenkirchen 200 Göttingen 98 Hamburg 99 Hannover 100 Köln 97 Konstanz 150 Krefeld 112 Lübeck 106 Mainz 117 München 135 Münster 100 Oldenburg 108 Osnabrück 150 Passau 123 Saarland 135 Stuttgart 126 Tübingen 200 Ulm (Donau) 140 Wetzlar 122 Wilhelmshaven 85 Wolfsburg 112 10 Urban drainage

  16. 70 = 30 min t R (mm) 60 j h 50 s 40 s h 30 Pm Maximum rain depth 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Year j Frequency analysis z-years event 10 Urban drainage

  17. Frequency analysis z-years event Mean value Standard deviation Frequency factor fK = f (duration of data collection, frequency)  from tables 10 Urban drainage

  18. Return period for sewer design Catchment Return period (a) Mixed structures 1 – 2 City centre, important industry area 1 – 5 Streets, not in cities areas 1 5 – 20 Street underpass, underground 10 Urban drainage

  19. Historical rain events Significance Critical impacts to receiving waters Less significance for sewer design Prerequisites for data collection Measuring time period Resolution in time Resolution in space Time synchronisation Data bank systems 10 Urban drainage

  20. 10 Urban drainage 10.2 Rain-runoff process 10 Urban drainage

  21. Peak runoff factor r·A QR rmax·A QP Runoff duration Rain duration 10 Urban drainage

  22. Peak runoff factor Pand coefficient P 10 Urban drainage

  23. Peak runoff factor = f(rain intensity r, slope J) 1 0,9 4% < < 10% J (-) 0,8 P y 0,7 0,6 0,5 r = 225 (l/(s·ha)) r = 180 (l/(s·ha)) 0,4 Peak runoff factor r = 130 (l/(s·ha)) 0,3 r = 100 (l/(s·ha)) 0,2 0,1 0 0 0,2 0,4 0,6 0,8 1 Impervious area (-) 10 Urban drainage

  24. Dry- and wet-weather runoff Population density e = 100 Inh/ha DrWa-consumption q = 100 l/(Inh·d) Rain intensity r15(1) = 100 l/(s·ha) Peak runoff factor P = 0,4 DW WW 10 Urban drainage

  25. Rain-runoff-process in two steps Runoff production r·A Q Runoff concentration Time 10 Urban drainage

  26. Losses and runoff production Permanent losses Infiltration losses Wetting losses Depression storage Rain intensity Runoff Rain duration 10 Urban drainage

  27. Pervious area 10 Urban drainage

  28. Surface runoff and infiltration 10 Urban drainage

  29. Surface classification 10 Urban drainage

  30. Rain duration to produce maximum runoff ra Qa tR< tC tR tC rb Qb A tR= tC tC 2 tC 10 Urban drainage

  31. Rain duration to produce maximum runoff A Qc rc tR> tC tR tR+tC Concentration time = surface runoff time + flow time in sewer 10 Urban drainage

  32. Assumption of decisive rain duration with a lack of information 10 Urban drainage

  33. Rationale method 3 1 2 4 5 6 for Point 3 for Point 4 Iteration with effective concentration time tC 10 Urban drainage

  34. Rationale method 10 Urban drainage

  35. Application of rain-runoff models Rationale method  Maximum flow rate  Extreme rain event as input  Dimensioning of sewer cross section Detailed numerical simulationen  Flow as a function of time at every point in the system  Measured rain events as input  Evaluation of functionality of sewer system  Optimisation of operation and control  Estimation of impact to receiving water 10 Urban drainage

  36. 10 Urban drainage 10.3 Sewer structure elements 10 Urban drainage

  37. Combined system Rain water Groundwater , Drainage, … Domestic and industrial sewage clean polluted Comb syst CSO WWTP Rain water Groundwater , Drainage, … Domestic and industrial sewage clean polluted Comb syst Infiltration CSO WWTP Groundwater aquifer 10 Urban drainage

  38. Combined system 10 Urban drainage

  39. Combined system Cross section through street underground Gully Manhole House connection No access for rehabilitation (DIN 1998) 10 Urban drainage

  40. Separate system Rain water Groundwater, drainage, … Domestic and industrial sewage clean polluted Storm sewer Sewage sewer Rainwater treatment WWTP Rain water Groundwater, drainage, … Domestic and industrial sewage clean polluted Storm sewer Sewage sewer Infiltration Rainwater treatment WWTP Groundwater aquifer 10 Urban drainage

  41. Separate system 10 Urban drainage

  42. Separate system Cross section through street underground Manholes Gully Street water Roof water House connection: sewage DIN (1998) 10 Urban drainage

  43. Comparison of combined and separate system Target Combined system Separate system WWTP • Distinct load variation • Theoretically relatively homogeneous loading re. both flow and load • Storage tanks needed • Increased design requirements • CSO includes part of the sewage • Stormwater discharge untreated Receiving water • No sewage directly to river • Time delay before combined water is discharged • No retention, quicker discharge Sewer system • Lower contruction costs • 2 sewers, more expensive • More space requirement in the ground • Space requirements in the region of retention tanks • Not retention tanks needed 10 Urban drainage

  44. Comparison of combined and separate system Target Combined system Separate system Sediments • Frequent self-flushing • More susceptible to sedimentation • Rel. small slope needed • Higher slope needed • Less cleaning required • More cleaning required Maintenance • Increased total sewer length • Better air exchange House connection • No mis-connections • Mis-connections • Backwater effect to cellars • No backwater effects Pumping • If possible only sewage has to be pumped • High pumping performance needed which is used only seldomly 10 Urban drainage

  45. Sewer cross sections 10 Urban drainage

  46. „Other“ sewer profile 10 Urban drainage

  47. Elements of stormwater treatment Function Element Applied in Overflow • CSO structure Combined system • Sewer overflow • First flush tank Combined water retention Combined system • Flow-through tank • Combined tank • Storage channel Stormwater treatment Separate system Stormwater retention Comb., sep. system Pollutants retention • Sewage retention tank Upstream comb. Syst. • Gully Comb., sep. system 10 Urban drainage

  48. Operation of combined water oberflow structures River Weak rain CWRTR SO CSO WWTP moderate CWRTR rain SO CSO WWTP intense CWRTR CWRT combined water retention tank WWTP wastewater treatment plant SO sewer overflow CSO CSO structure rain SO CSO WWTP Extreme - CWRTR event SO CSO WWTP 10 Urban drainage

  49. Overflow structure with side weir Overflow at Throttle flow Mixing ratio resp. with cDW > 600 mg/l 10 Urban drainage

  50. „Leaping Weir“, bottom outlet 10 Urban drainage

More Related