Antonio Conde, PH-CMX • CAD MODELS FOR MPGD CHAMBERS II MPGD WORKSHOP
POINTS 1 DIMENSIONAL & GEOMETRICAL CHANGES 2 SINGLE CHAMBERS INSTALLED 3 DOUBLE CHAMBERS 4 INSTALATION PROCEDURE 5 PATCH PANEL SCKETCH II MPGD WORKSHOP
1 DIMENSIONAL & GEOMETRICAL CHANGES II MPGD WORKSHOP
THICKNES REDUCED 1 mm IN THESE TWO SPACERS II MPGD WORKSHOP
CHIMNEY WILL BE CONICAL IN STEAD OF PARALELL AS HERE 8 mm. (enough for services) THE HEIGHT WILL BE REDUCED 13mm. (15 before) II MPGD WORKSHOP
24 CONNECTORS NOW (8 BEFORE) NEEDS CONICAL CHIMNEY II MPGD WORKSHOP
NEW CONICAL CHIMNEY (24 connectors) OLD PARALELL CHIMNEY II MPGD WORKSHOP
GOOD GAP BETWEEN TWO CHIMNEYS (NO CLASHES) II MPGD WORKSHOP
2 SINGLE CHAMBERS INSTALLED II MPGD WORKSHOP
SET OF CHAMBERS MOUNTED ON THE BACK FLANGE 9° RADIAL RAILS 9° ROTATED RAILS II MPGD WORKSHOP
INSERTION WINDOWS IN THE BRACKETS OF THE BACK FLANGE II MPGD WORKSHOP
3 DOUBLE CHAMBERS (S.C.) II MPGD WORKSHOP
VERY COMPACT CHAMBERS NOW II MPGD WORKSHOP
GAP BETWEEN CHAMBERS: 1mm • STACKED CHAMBERS TOTAL HEIGHT: 98mm II MPGD WORKSHOP
GAP BETWEEN BACK FLANGE & MUON CHAMBERS: 100mm II MPGD WORKSHOP
TWO TYPES OF PIVOTS & ANGLES BUT ONLY 1 ONE TYPE OF CHAMBER FOR ALL SC both SC match well (2 or 3 emptyprotosshouldbe made then insered in all the positions, the nextopening of the detector put in the schedule??) II MPGD WORKSHOP
4 INSTALATION PROCEDURE (same for single chamber or SC) II MPGD WORKSHOP
4 INSTALATION PROCEDURE 4.a FIRST SC II MPGD WORKSHOP
FIRST SC TO ENTER II MPGD WORKSHOP
FIRST SC ENTERING II MPGD WORKSHOP
FIRST SC ENTERED TO PIVOT STOP II MPGD WORKSHOP
FIRST SC ROTATED TO ITS FINAL POSITION II MPGD WORKSHOP
4 INSTALATION PROCEDURE 4.b SECOND SC II MPGD WORKSHOP
SECOND SC TO ENTER II MPGD WORKSHOP
SECOND SC ENTERING II MPGD WORKSHOP
SECOND SC IN ITS FINAL POSITION II MPGD WORKSHOP
THE TWO TYPES OF SC MATCHING IN PLACE II MPGD WORKSHOP
4 INSTALATION PROCEDURE 4.c THIRD SC II MPGD WORKSHOP
THIRD SC ENTERING II MPGD WORKSHOP
NEEDS TO BE ROTATED 4° TO AVOID CLASH 4° II MPGD WORKSHOP
WHEN ROTATED 4°, THE SC ENTERS WELL (same as RPC’s) II MPGD WORKSHOP
THIRD SC IN ITS FINAL POSITION II MPGD WORKSHOP
4 INSTALATION PROCEDURE 4.d FOURTH SC II MPGD WORKSHOP
FOURTH SC TO ENTER II MPGD WORKSHOP
FOURTH SC ENTERING II MPGD WORKSHOP
FOURTH SC IN ITS FINAL POSITION II MPGD WORKSHOP
5 PATCH PANEL SCKETCH II MPGD WORKSHOP
PATCH PANELS (their surface coverthe twoopenings of the chimneys for each SC) II MPGD WORKSHOP
25 mm. length, SPACERS II MPGD WORKSHOP