90 likes | 188 Views
Electronics Boxes: a Change to the LAYOUT?. F. Grancagnolo, R. Perrino INFN Lecce. ATLAS-RPC Meeting / Roma, Nov. 5 th , 2002. How to hold the trigger/splitter boxes - BML. How to hold the trigger/splitter boxes- BMS.
E N D
Electronics Boxes: a Change to the LAYOUT? F. Grancagnolo, R. Perrino INFN Lecce ATLAS-RPC Meeting / Roma, Nov. 5th, 2002.
PROPOSAL: since the boxes are placed on the outer side of the outer layer, we would reverse the BML-A chambers upside-down and use the thick support panel #3 to hook the boxes.
For the BMS-C* this does not apply, because the boxes are placed on the inner side of the inner layer. This is the same for the few BMS-A.