1 / 4

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ PAC Closing Report ] Date Submitted: [ March 15 , 2012 ] Source: Myung-Jong Lee 7 Company [CUNY]

prem
Download Presentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[PAC Closing Report] Date Submitted: [March 15, 2012] Source:Myung-Jong Lee7 Company [CUNY] Address [Dept of EE, CUNY, 140th St, New York, NY 10031] Voice:[+1-212-650-7260], FAX: [], E-Mail:[lee@ccny.cuny.edu] Re: [.] Abstract:[] Purpose:[Report of PAC activities during March 2012 Plenary meeting at Big Island, HI] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Myung Lee, CUNY

  2. PAC Closing Report March 15, 2012 Myung Lee, CUNY

  3. Achievements • 6 time slots at this meeting • Comments for PAC PAR and 5C • WG11, Steve Shellhammer, Adrian Stevens • Doc#15-12-0159r0 • Main activity was to prepare responses to the comments for PAR and 5C, doc#15-12-0159r0 • Revised PAR and 5C: doc#15-12-0157r0, doc#15-12-0158r0 • SG-PAC approved the summary and revised PAR &5C • WG15 approved the revised PAR and 5C during Mid-term plenary • A presentation by Seunghoon Park to discuss procedures and documents to be prepared. Doc#15-12-0156-r0 Myung Lee, CUNY

  4. Plan for Atlanta • Teleconference (if necessary) • Teleconf. bridge provided by Samsung • International: 1-972-301-6000 • Toll Free(USA): 1-877-776-7842 • Discuss TG plan • Officer election • Prepare Call for Applications and Intentions • Prepare Application Matrix • Initial discussion on technical requirement document Myung Lee, CUNY

More Related