10 likes | 122 Views
The Spirexpress “M” Factor. 50,000. Competitor Cost. 40,000. The ‘M’ Factor. 30,000. SPX Cost. Cumu l ative Project Cost. 20,000. 10,000. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Projects.
E N D
The Spirexpress “M” Factor 50,000 Competitor Cost 40,000 The ‘M’ Factor 30,000 SPX Cost Cumulative Project Cost 20,000 10,000 1 2 3 4 5 6 7 8 9 10 11 12 Projects