20 likes | 127 Views
19 th May 2010: 1533 Ar HHG – LONG pulse (Ne target) RABITT scan (Al filter). IR=0.90mW. as 1510 but 60sec integration and 0.1fs steps. 20 th May 2010: 1734, 100 as stepsize, 30 sec integration time, power 1.13mW.
E N D
19th May 2010: 1533 Ar HHG – LONG pulse (Ne target) RABITT scan (Al filter) IR=0.90mW as 1510 but 60sec integration and 0.1fs steps
20th May 2010: 1734, 100 as stepsize, 30 sec integration time, power 1.13mW Retweaked fiber and z position of harmonic jet from 1314 run – better signal rate than before. Note also long delay and XUV only saved to this folder too.