110 likes | 193 Views
For NPD & Line Extension Projects. Use the following two slides. Date : mm/ dd / yy. Project Title : x Project Lead: X Area/ Dept : X. 6. 5. 1. 3. 2. 4. Project Summary: x. Insert Product Photo. Schedule. Project Financials. Date : mm/ dd / yy.
E N D
For NPD & Line Extension Projects Use the following two slides
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X 6 5 1 3 2 4 Project Summary: x Insert Product Photo Schedule Project Financials
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X 6 5 1 3 2 4 • Issues & Recovery Plan • Issue: • Root Cause: • Action: • Responsible: • Due By:
Other type of projects (Lean, Cost Reduction, Sourcing, Technology, etc) Use the following two slides
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X Plan Do Check Act Project Summary: x Insert Photo Project Financials Schedule
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X Plan Do Check Act • Issues & Recovery Plan • Issue: • Root Cause: • Action: • Responsible: • Due By:
For Quality Issues Use the following two slides
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X D4 D8 D6 D3 D5 D7 D1 D2 • Problem Definition (D2): • Who detected problem • What is the problem • When was it detected • Where was it detected • How many were found • Root Cause(D4): • x Insert Project or Issue Photo Containment (D3) Key Actions
Date:mm/dd/yy Project Title: xProject Lead: X Area/Dept: X D4 D8 D6 D3 D5 D7 D1 D2 Team (D1) • Quality: • Design Eng: • Manufacturing Eng: • Supervisor: • Product Mgmt: • Supply Chain (if appl): Corrective Action (D5) • Action • Responsible • Due By: Share the Solution (D7) • Other parts/products: Closure (D8) • Responsible • Due By: Verify Actions Effective (D6) • Action • Responsible • Due By:
For Generic Updates (visual management board, kaizen event, etc) Use the following slide
Date:mm/dd/yy Title: xOwner: X Area/Dept: X Title Title x x Title Schedule x