An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Briefing For: 40MM Industry Day 29 Jan 2004 ARDEC 40MM GRENADE3D TDP CONVERSION EFFORT PRESENTED BY: RAYMOND COIRO TEAM LEADER DRAFTING ECP/ERR TEAM CONFIGURATION MANAGEMENT - TECH DATA rcoiro@pica.army.mil 973-724-3629

  2. GOALS • To create and provide to the PM a 3D Technical Data Package (TDP) available for competitive bid. • Provide 3D Models and Drawings for the 40MM Family of Grenades in accordance with ARDEC 3D TDP Standards. • Bring 3D Modeling Technology In-House (ARDEC) instead of out-sourcing to other facilities and contractors.

  3. 3D TDP Standards and Modeling • All 3D Models and Drawings are being created using the policies set fourth by ARDEC for creating 3D TDP’s. • All modeling is being done in-house and two full-time contractor employees are assigned to the job.

  4. Completed 3D TDP Deliverable for Contract 3D Technical Data Package Consisting of: Disc One PDF Format of all 2D ProE Drawings. (Contractually Binding) Disc Two (Bonus Disc) ProEngineer 3D Models and Drawings. STEP format of all 3D Models. VRML files of all 3D Models.

  5. 40MM Grenade Family

  6. 40 MM 3D Conversion Status • M385A1 Practice 3D Models/Detail Drawings, completed as scheduled for Engineering Review: November 5, 2003 • M169 Cartridge Case 3D Models/Detail Drawings, completed as scheduled for Engineering Review: November 5, 2003 • M918 Practice 3D Models/Detail Drawings, completed as scheduled for Engineering Review: December 3, 2003 • M781 Practice 3D TDP (Technical Data Package) completed and available for procurement from Tech Data.

  7. 40 MM 3D Conversions Status cont. • M583A1 White Star ParaScheduled completion date:Feb. 25th 2004 3D Models WIP (work in progress), 25% completed. Drawings WIP, 3% completed. • M16A2 40MM LINKRevised completion date: Feb. 11th 2004 3D Models WIP, 90% completed. Drawings WIP, 50% completed. • M430A1 HEDPRevised completion date: Feb. 11th 2004 3D Models WIP, 75% completed. Drawings WIP, 10% completed. • M433 Scheduled completion date:Feb. 27th 2004 3D Models/Detail Drawings are being completed at Rock Island Arsenal. 3D Models WIP, 75% completed. Drawings WIP, 60% completed.

  8. 40MM, Practice, M385A1 • 3D Models/Drawings Completed as scheduled - 11/05/2003 for Engineering Review.

  9. 40MM, Practice, M385A1

  10. 40MM, M385A1, Practice

  11. M385A1 Exploded View

  12. 40MM, M169 CARTRIDGE CASE Used in M385A1 3D Models/Drawings Completed as scheduled - 11/05/2003 for Engineering Review.

  13. M169 Cartridge Case

  14. Case, Cartridge 40MM M169for M385A1

  15. 40MM, Practice, M918 • 3D Models/Drawings Completed as scheduled - 12/03/2003 for Engineering Review.

  16. 40MM, Practice, M918

  17. 40MM, Practice, M918

  18. M918 Cross Section

  19. M918 Exploded View

  20. 40MM, Practice, M781 • 3D Models/Drawings have been released for Tech Data and are available for 3D TDP.

  21. 40MM, Practice, M781

  22. 40MM, M781, Practice

  23. M781 Exploded View

  24. 40MM, M583A1 White Star Para • Scheduled Completion Date 02/25/2004 for 3D Models/Drawings for Engineering Review.

  25. 40MM, M583A1, White Star Para

  26. M583A1 Cross-Section

  27. M583A1 Exploded View

  28. 40MM, M16A2 Grenade Link • Scheduled Completion Date 02/11/2004 for 3D Models/Drawings for Engineering Review.

  29. 40MM, M16A2 Grenade Link

  30. 40MM, M16A2 Grenade Linked

  31. 40MM, M16A2 Grenade Linked

  32. 40MM, M430A1 HEDP • Scheduled Completion Date 02/11/2004 for 3D Models/Drawings for Engineering Review.

  33. 40MM, M430A1 HEDP

  34. 40MM M430A1 Exploded view

  35. CONCLUSION • To make the PM and Customers happy by providing an up-to-date 3D TDP and passing on the 3D Technology to the PM and customer.