1 / 8

H-jet problems and plans

H-jet problems and plans. A. Zelenski RSC meeting July 22, 2004. H-jet operation April 6 – May 14. Apr.13. Apr.28. May 6-16. May 2. Apr.21-22. Dissociator maintanence. IR 12-vacuum schematic diagram. H-jet. Pwx2.11. Pwx2.12. QMA upgrade for H-jet measurements.

prue
Download Presentation

H-jet problems and plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. H-jet problems and plans A. Zelenski RSC meeting July 22, 2004

  2. H-jet operation April 6 – May 14 Apr.13 Apr.28 May 6-16 May 2 Apr.21-22

  3. Dissociator maintanence

  4. IR 12-vacuum schematic diagram H-jet Pwx2.11 Pwx2.12

  5. QMA upgrade for H-jet measurements. Original QMA geometry (right) Expanded QMA sensitive volume (left) 10 mm

  6. H-JET POLARIMETER SCATTERING CHAMBER PM Filter,650nm Lenses

  7. H-JET POLARIMETER SCATTERING CHAMBER Analyzing magnet FC Electron gun Extraction optics

  8. Problems. • Turbomolecular pump failures. • Frequent dissociator maintenance. • Plans. • Improve dissociator operation stability and lifetime between services.. • Measure atomic beam velocity to get a better accuracy for the target thickness. • Develop diagnostics devices for molecular hydrogen component measurements.

More Related