130 likes | 146 Views
Study on PCB and PBDE loads at Mallard Island from 2002 to 2006 using modified methods, including SSC data analysis, regression relationships, and historic load estimates.
E N D
Item #1 PCB and PBDE loads at Mallard Island on the Sacramento River:WYs 2002 - 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November 13th 2006
Item #1 PCBs and PBDEs at Mallard Island MODIS 250km True Color Image | January 9, 2006
Item #1 Modified Methods for PBDEs and PCBs • Use SSC data from USGS from 1995 to present • Not applicable for PCBs and PBDEs • 2. Use instantaneous SSC and contaminant data • to develop a regression relationship (WY 2005-2006) • Estimate 15 minute contaminant concentrations • Calculate daily average concentrations • Use linear interpolation to fill data gaps • Regression not valid, use FWMC • 6. Combine estimated daily concentrations with • Delta Outflow to estimate daily advective loads • Correct loads for the effect of tidal influence • and dispersion
Item #1 PCBs
Item #1 PBDEs
Item #1 PCBs vs SSCWY 02-06 No Significant Relationship Will Use FWMC Instead.
Item #1 PBDEs vs SSCWY 04-06 No Significant Relationship Will Use FWMC Instead.
Item #1 Flow Weighted Mean Concentrations
Item #1 Loads
Item #1 Estimating Historic Loads by Linear Regression with Discharge
Item #1 Historic Load Estimates
Item #1 How did WY05 & WY06 compare to previous years? Annual Discharge (Mm3) Min = 3055 (WY77) Max = 79269 (WY83) Mean = 23508 WY06 = 50721 WY05 = 18588