Team 3 - TRIumph

Matt Disselkoen Amy Newland Jamison Vande Ree. Team 3 - TRIumph. Presentation Outline. Team Introduction Project Background Project Description Project Constraints Completed Tasks Christian Perspective Work Planned Q & A. TRIumph Group Members.

pules
Download Presentation

Team 3 - TRIumph

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Matt Disselkoen Amy Newland Jamison Vande Ree Team 3 - TRIumph

  2. Presentation Outline • Team Introduction • Project Background • Project Description • Project Constraints • Completed Tasks • Christian Perspective • Work Planned • Q & A

  3. TRIumph Group Members Matt Disselkoen M.E., Amy Newland M.E., Jamison Vande Ree M.E.

  4. Project Background • myTEAMTRIUMPH • Angels and Captains • Two separate units • Assembly issues • Bulky • Triathlon transfer station

  5. Current Designs Running Chair Bike Trailer

  6. Project Description • Combine ride-behind and push units • Aerodynamic and smooth • Improve connection joints • Improve weight capacity

  7. Project Constraints • Safety – ADA standards • Lightweight • Collapsibility • Braking

  8. Completed Tasks • Met with Lisa Staples, Logistics Director of myTEAM TRIUMPH • Current design flaws • Desired design improvements • Met with Glenn Remelts • Acquired and tested current design • Set up team website • Wrote PPFS Outline • Discussed various design alternatives

  9. Christian Perspective • Caring • myTEAM TRIUMPH • Justice • Improve design for all persons involved • Trustworthy • Reliable design features • Integrity • Easy to use, performs intended functions

  10. Planned Work • Meet with Terence Reuben, Medical & Equipment Director • Meet with industrial consultant • Update team website • Continue PPFS Report • Narrow down design alternatives