An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EIP Status

  2. Changes Since PDR • EIP cable ID • Each EIP gets unique ID (simplifies network) • (4) EIP Ethernet Connectors (was 2) • 8 10/100 ports, 4 1G ports (unchanged) • Finalized connector locations • All inputs on left, all outputs & data on front • GPS feed on right (GH only)

  3. Ethernet • EIP Box Connector: See Pinouts • (2) 100Mbit x 4 & (2) 1Gbit x 2 • Mates to TVP06RQW21-75S ($800/ea) • Bulkhead Connector: • Amphenol 10-646787-75S ($2k/ea) • Pin / Socket, 21-75 shell style • Leak Rate: 1*10-3 cm3/s (~0.3 ft3/mission) • Mates to TVP06RQW21-75S & TVP06RQW21-75P ($600/ea) • Cable: Tensolite NF24Q100 ($4/ft) • $15k/ER2, $4k/WB57

  4. Electrical

  5. Mechanical • Pre-production design complete • Dimensions are same as legacy ER-2 EIP • 10.6” W x 6.72” L x 4.32” H • 38% volume reduction by consolidating EIP & ethernet switch

  6. Mechanical

  7. Mechanical • 3D Model, or images from sheet metal dwg.

  8. Global Hawk • Mark III design will differ slightly for manned vs. unmanned observatories • Mark III EIPs can be swapped between manned & unmanned aircraft with minor functionality & cabling changes

  9. Spares Policy • Swap out EIPs in field, send faulty units to ASF for servicing • EIP internal design is modular; most failures can be accommodated by swapping “modules” • WB-57: 3 spares (total) • ER-2: 3 spares (total) • Global Hawk: 2 spares (total)

  10. Schedule / Milestones • EIP Milestones: • Aircraft Fit Check: 2/4/11 • Start of Pre-Production: 3/23/11 • Pre-Production Test: 4/20/11 • Qualification Test: 5/2011 • CDR: 4/2011 • Start of Production: 5/2011 • Production Complete: 7/2011

  11. Purchasing • EIP Assembly cost should be known in 2/2011 • The following items are currently unfunded: • NASDAT backup IMU ($75k) • Aircraft ethernet cable & bulkheads ($38k) • GPS splitters for ER-2 & WB-57 ($24k) • Remaining WB-57 EIPs (10) • Global Hawk EIPs (10)