MICE funding status as of August 2005. at this point MICE (PhaseI) is an approved and funded project in 5 countries -- UK: 9.7M£ -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal -- success: 750k$)
E N D
at this point MICE (PhaseI) is an approved and funded project in 5 countries -- UK: 9.7M£ -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal -- success: 750k$) + propose to build solenoid magnet within MC budget (+ longer term plan for Coupling coil) (Zisman at CB) ==>total expected 5.5 M$ in hardware -- Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) (+ 500k$ requested) -- Switzerland: PSI solenoid + Uni-Geneva-NSwissF (80KCHF/yr)+ 1 PDA+1PhDS bids to be placed for coupling coil (~1MCHF) and refurbishing of CERN RF power source O(170kCHF) -- Netherlands: Mag probes (in production!) + 1 PhDS MICE is CERN recognized experiment RE11. + Proposal submitted in Italy (TOF, Calorimeter) and Belgium (Cherenkov)
Beam UK 3.6 M£ • Infrastructure UK 2.1 M£ • Beam solenoid CH 2 MCHF • TOF0 INFN 150 K • CkovI US(Mississipi) 100 K • TOF I INFN 150 K • Tracker Solenoid I US (LBL) 1.25 M$ • Tracker I&II • frames and detectors UK 1.4 M£ • fibers, DAQ Japan 0.4 M$ • VLPC and electronics US 0.75 M$ • Focus Coils UK 2.2M£ • Absorbers US-Japan • Hydrogen system UK • Coupling Coils US, CH 1.6M$ • RF cavities modules US 1M£ • RF power sources CERN 1.2 MCHF + 0.17MCHF • US 0.5 • UK 1 M£ • Tracker Solenoid II US (LBL) 0.8 M$ • ToF II INFN 150 K • CkovII Belgium 100 K • MuCal INFN 350 K • DAQ CH 300 KCHF