An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Second LHC Splice ReviewWelcome and information on the organization of the MSC group L. Bottura

  2. LS1 project • Priorities • LHC beam to maximum energy (up to 6.5 … 7 TeV) • reliable operation • other interventions • Key drivers • Circuit (splice) consolidation • R2E • Maintenance • 20 months from beam off to beam on • Project leader: F. Bordry (TE-DL)

  3. Group structure as of July 2011 Magnet and circuits integration aspects (e.g. feed-boxes) Magnet design and technology

  4. Main changes w/r to October 2010 • Change in group structure with modest, but significant, modification of the section mandates • Large rotations in section leaders (5/7) • Circuit consolidation is one of the main missions • Large contribution to the work (approx. 70 FTE concerned as of today) • Project leader: Jean-Philippe Tock (in GLO)

  5. Welcome ! • Jean-Philippe will guide you through the details of the review • This is an important step in the life of the LHC: the circuit consolidation must be done well… • … and hopefully only once ! • Thank you for your availability and contribution