Second LHC Splice Review Welcome and information on the organization of the MSC group. L. Bottura. LS1 project. Priorities LHC beam to maximum energy (up to 6.5 … 7 TeV ) reliable operation other interventions Key drivers Circuit ( splice ) consolidation R2E Maintenance
E N D
Second LHC Splice ReviewWelcome and information on the organization of the MSC group L. Bottura
LS1 project • Priorities • LHC beam to maximum energy (up to 6.5 … 7 TeV) • reliable operation • other interventions • Key drivers • Circuit (splice) consolidation • R2E • Maintenance • 20 months from beam off to beam on • Project leader: F. Bordry (TE-DL)
Group structure as of July 2011 Magnet and circuits integration aspects (e.g. feed-boxes) Magnet design and technology
Main changes w/r to October 2010 • Change in group structure with modest, but significant, modification of the section mandates • Large rotations in section leaders (5/7) • Circuit consolidation is one of the main missions • Large contribution to the work (approx. 70 FTE concerned as of today) • Project leader: Jean-Philippe Tock (in GLO)
Welcome ! • Jean-Philippe will guide you through the details of the review • This is an important step in the life of the LHC: the circuit consolidation must be done well… • … and hopefully only once ! • Thank you for your availability and contribution