90 likes | 202 Views
ABET Automated Program Evaluator’s Report (APEVR). SE 685 Monmouth University Practicum Team. Presented By: Simon Baik David Best Samuel Crutcher Rahul Patel Grzegorz Szpura Joseph Tran. Today’s Presentation…. Introduction/Background Solution Key Features Prototype Demonstration
E N D
ABET Automated Program Evaluator’s Report (APEVR) SE 685 Monmouth University Practicum Team Presented By: Simon Baik David Best Samuel Crutcher Rahul Patel Grzegorz Szpura Joseph Tran
Today’s Presentation….. Introduction/Background Solution Key Features Prototype Demonstration Schedule Milestones Lessons Learned Questions
Introduction/Background Accreditation Board for Engineering and Technology (ABET) Inc., The accreditor for college and university programs in various technology programs Wants to improve the Accreditation Report Preparation Process Before and during the visit each Program Evaluators (PEVs) prepares their reports Manual Process in Place All reports and forms are in word document format All reports and forms are hand written by Program Evaluators (PEVs) Process is time consuming PEVs have great difficulty ensuring consistency among the various reports
Solution Proposing a PC based process Developing a stand-alone system All forms can be filled out using the system All forms will follow a consistent format Certain parts of the forms will be auto-generated Recommended Accreditation Action will be determined automatically by the system Value-Added Will save time for each Evaluators Process will be faster Easy to track consistency among the various reports
Key Features Fill out the following forms: Program Evaluator Basic Information Sheet Curriculum Analysis Form Transcript Analysis Form Program Evaluator Worksheet Program Audit Form Generate the following forms: Exit Statement Recommended Accreditation Action Form Basic: Load Save Auto-Save Print Combine Exit Statements Merge Program Audit Forms Microsoft Word Format
Schedule Milestones Project Start September 8, 2009 *To Be Determined (TBD)
Lessons Learned Frequent communication between all stakeholder Requirements needs to be clear and concise Central repository for project artifacts