SunGuideTM Software Development ProjectTest Readiness Review (TRR) MeetingNovember 27, 2007
Agenda SunGuide TRR Meeting
Introductions SunGuide TRR Meeting
Agenda SunGuide TRR Meeting
Logistics • District 4 staff will discuss: • Test area • Resources available SunGuide TRR Meeting
Agenda SunGuide TRR Meeting
Current Project Status:From a Development Perspective • Solid: • 511 • VSL • CE • AD CCTV Driver • EV • Web Server • EM • RS • AVL/RR • IDS • ODS • RPG • What is not ready: • Some Responder Audit screens (2 of 7 are not complete) SunGuide TRR Meeting
Responder Audit RequirementsSome will not be tested this week SunGuide TRR Meeting
Responder Audit RequirementsSome will not be tested this week - continued SunGuide TRR Meeting
Forward Looking Schedule • IV&V – TERL (FDOT/PBS&J led activity): • Dry Run: Nov 26 – Nov 30 • Actual Test: Dec 3 – Dec 7 • Installs: • Nov 26: TERL • Nov 12-26: D4 • Dec 3-7 : D5 • Dec 3-7 : D6 • Dec 10-14: D2 (may start early) • Dec 10-14 : D7 (may start early) SunGuide TRR Meeting
Agenda SunGuide TRR Meeting
Purpose of TRR / FAT • Purpose: • Review preparations for testing • Walk through the test procedures at a very high level and determine if anyone has any comments • Ground Rules: • Testing will not depart from the written procedures • Any requested “ad hoc” testing will occur after the formal testing process • Re-writing of requirements / scope additions will be captured for future consideration • Approvals: • FDOT/SwRI will witness each test case (on “Master SICP”) • At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP” SunGuide TRR Meeting
Hardware Configuration • District 4 staff to describe hardware environment SunGuide TRR Meeting
IC-1: Configuration Editor (CE) IC-2: Variable Speed Limit (VSL) IC-3: American Dynamics Closed Circuit Television (AD CCTV) Driver IC-4: 511 (511) IC-5: Web Server (WS) IC-6: Automatic Vehicle Location (AVL)/Road Ranger (RR) IC-7: Incident Detection Subsystem (IDS) IC-8: Event Management (EM) (includes Responder Audit) IC-9: Response Plan Generation (RPG) IC-10: Reporting Subsystem (RS) IC-11: Event Viewer (EV) IC-12: Operational Data Store (ODS) IC-13: General Subsystem Updates (GEN) Release 3.0 Integration Cases SunGuide TRR Meeting
FAT 3 Limitations • Two of the Responder Audit screens have not been completed (5 are available for testing) • Comment: D5 has an install (and using operationally) the following R3.0 components: • 511 • AD CCTV Driver • VSL • Web Server • Release 3.0 core components (C2C, GUI, MAS, Data Bus, TSS) SunGuide TRR Meeting
Test Case Example SunGuide TRR Meeting
Questions About Test Cases? SunGuide TRR Meeting
Agenda SunGuide TRR Meeting
Open Discussion SunGuide TRR Meeting