1 / 1

CREATING AWARENESS: Brook Signal Replacement

C. C. CREATING AWARENESS: Brook Signal Replacement. ON HALF WALL. Atlantic Terminal – Brook Interlocking. 1. A. *. C. 2. B. *. B1e. 3. FLATBUSH. *. B. AVE. C. *. 4. 5. C. *. *. Tracks 2 and 4 Low Home type signals have been replaced by Color Light Signals. 6. ON WALL.

quinto
Download Presentation

CREATING AWARENESS: Brook Signal Replacement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C C CREATING AWARENESS: Brook Signal Replacement ON HALF WALL Atlantic Terminal – Brook Interlocking 1 A * C 2 B * B1e 3 FLATBUSH * B AVE. C * 4 5 C * * Tracks 2 and 4 Low Home type signals have been replaced by Color Light Signals 6 ON WALL On May 17, 2014 at 1:01 pm, GN 5-53 will go into effect. The low home signals located on 2 and 4 Station Tracks in Brook Interlocking will be replaced with Color Light Signals. This signal improvement is intended to help improve signal visibility for Engineers and Conductors who are responsible for the safe movement of trains. Please remember to be aware of your surroundings and remain focused while performing your duties. Any questions or suggestions, please contact a Road Foreman.

More Related