1 / 8

Status of the COSMO web

Status of the COSMO web. Cosmin Barbu, Rodica Dumitrache, Bogdan Maco. National Meteorological Administration of Romania. COSMO General Meeting, Rome, 5-9 September 2010. Outline: COSMO web team & activity Common overview of the COSMO web site Work done 2010-2011

quito
Download Presentation

Status of the COSMO web

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania

  2. COSMO General Meeting, Rome, 5-9 September 2010 • Outline: • COSMO web team & activity • Common overview of the COSMO web site • Work done 2010-2011 • Work planned for 2011-2012 • Open discussions

  3. COSMO General Meeting, Rome, 5-9 September 2010 COSMO web team & work activity • Ulrich Schaettler (DWD) – WG6 coordinator • Theodore Andreadis (HNMS) • Cosmin Barbu, Bogdan Maco (NMA) • others: PP leaders, WG coordinators, COSMO scientists

  4. COSMO General Meeting, Rome, 5-9 September 2010 Common overview • General information about COSMO (members, structure, meetings, events, reports/plans, cooperations ) • General and specific information about COSMO model (documentation, technical reports, newsletters ) • Information about the COSMO tasks : • status & descriptions of the (old & current) COSMO priority projects • working group activities • Information about the current model • implementation of each COSMO member • User support & forum • Information about the SRNWP data • exchange programme www.cosmo-model.org

  5. COSMO General Meeting, Rome, 5-9 September 2010 Work done (2010-2011) • (regular activity) • Pages which has been updated: • PP & WG pages (task details, working plans, meetings, news) (old PP&WG + new: POMPA PP, WG7-”Predictability and Ensemble Methods”) • The minutes of STC & SMC meetings • Journal publications • The minutes and presentations of the workshops • Latest version of Fieldextra – see Cosmo utilities software section • The 11th COSMO newsletter • The operational pages for some COSMO members: (only) NMA, (hope soon) DWD • Science plan for 2010-2014 by M. Arpagaus Note: Information about the latest COSMO web updates can be found on a special page created by Theodore.

  6. COSMO General Meeting, Rome, 5-9 September 2010 Work to be done (2011-2012) • Pages which have to be updated: • The PP & WG pages + add new information for the new PPs that will come • The minutes of STC & SMC meetings (continuous work) • The operational pages for each COSMO member (information about basic model set-up, • computational resources, operational suite, DA cycle, detailed configuration – INPUT files) + some • suggestive photos • The verification report pages (most of them stopped at 2007) • The COSMO newsletter no. 12 • The research activities and the COSMO utilities software web pages • The presentations of User seminar, CLM training & workshops planned for 2012 • Creating a Frequently Asked Questions (FAQ) page for COSMO model installation issues (subtask of “Support of COSMO licensees”)

  7. COSMO General Meeting, Rome, 5-9 September 2010 Does the COSMO website need to be redesigned?? • If “YES” what could be the starting point for that?? • Do we need a more dynamical website? What will be the structure of the site? • Identify the most accessed information from the actual website and (maybe) redefine the target users • The website is based on html, js, css. Do we need other web technologies? (php, sql,asp…) • What could be the costs? (FTE’s) • If “NOT” what should be improved?? • Identify some web pages that we don’t need anymore • Create new menus/submenus for some scientific purposes • Re-design only the home webpage, but keep the same structure • Increase the communication within the consortium => web pages updated in time

  8. COSMO General Meeting, Rome, 5-9 September 2010 Thank you for your attention!

More Related