150 likes | 279 Views
THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS Mission Pre-Environmental Review University of California, Berkeley June 23, 2006. Conference Rooms. Main Conference Room.
E N D
THEMIS • TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS • RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START • THEMIS • Mission Pre-Environmental Review • University of California, Berkeley • June 23, 2006
Conference Rooms Main Conference Room Silver Addition Samuel Silver Space Sciences Laboratory Silver Annex • Coffee, and food at Silver Addition Main Entrance (outside) • Parking Passes, see Daniele • Other issues, see:Vassilis Angelopoulos or Peter Harvey For maps, etc. go to http://www.ssl.berkeley.edu/
Probe Carrier Status MILESTONES • PC-LV Mech Fit – 5/02/06 • PC-LV Elect Fit – 5/03/06 • PC PSR – 05/31/06 • PC Arrival at JPL PC-PAF Fit Check Probe – PC Fit Check
Probe Status MILESTONES • F2 PSR – 11/17/05 • F2 PER – 03/16/06 • F3 PSR – 03/23/06 • F4 PSR – 05/04/06 • F1 PSR – 05/31/06 • F5 PSR – 06/12/06 • MPER – 6/23/06 F2 I&T at UCB Magnetics at JPL EMC at JPL VIB at JPL TV at JPL Probe Fit Check
Instrument Status MILESTONES • FM1 PER – 05/02/05 • FM1 PSR – 09/21/05 • FM2/3 PER – 08/27/05 • FM2/3 PSR – 11/10/05 • FM4/5 PER – 11/10/05 • FM4/5 PSR – 05/05/06 FM4/5 Thermal Vac Instrument I&T FM2/FM3 Thermal Vacuum
Backup Slides Backup Slides RFAs by Probe