THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS

THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS FM1 Instrument Pre-Ship Review University of California, Berkeley September 21, 2005. Conference Rooms. Main Conference Room.

ross
Download Presentation

THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS • TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS • RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START • THEMIS • FM1 Instrument Pre-Ship Review • University of California, Berkeley • September 21, 2005

  2. Conference Rooms Main Conference Room • Coffee, and food at Silver Addition Main Entrance (outside) • Splinter room in Silver Annex Conference • Parking Passes, see Daniele • Other issues, see:Vassilis Angelopoulos or Peter Harvey Silver Addition Samuel Silver Space Sciences Laboratory Silver Annex For maps, etc. go to http://www.ssl.berkeley.edu/

  3. Agenda • AGENDA 

  4. THEMIS FM1 INSTRUMENT SUITE • PRE-SHIP REVIEW (PSR) • INTRODUCTION • Peter R Harvey • THEMIS Project Manager • University of California - Berkeley

  5. Mission Schedule THEMIS Bus, Instrument & Mission I&T Schedule PROJECT MGR. : PETER HARVEY STATUS AS OF: 9/01/05 MISSION MGR. : FRANK SNOW CY 2004 CY 2006 CY 2005 Probe Delivery MILESTONES M J M J A N D J F M A J A S O N D J F M A J S O CRR 2/04 4/22 CR @ HQ P1 PER 12/12-13 P2-P5 PER 4/20 MAJOR REVIEWS P1 Test Review FGM/SCM CDR 4/06-08 PSR 6/20-21 3/01-15 4/19-20 INSTRUMENT CDR 6/14-18 MISSION CDR BAU EDU#2 FLT 1 BAU P1 INTEGRATION & TEST AEB MECH H/W IRU 1 11/17 LEGEND 9/20 PROBE SUBSYSTEM HARDWARE AVIONICS B/U Swap out -- Intermediate Slack SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 5/02 6/09 C/O PROBE I&T -- Project Reserve BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL SHIP to JPL P1 Test Review 10/12 9/21 12/15 ENVIRONMENTALS -- Critical Path H/W ENVIRONMENTAL TEST & CLOSEOUTS (JPL) BAU EDU#1 FLT 2 BAU 3/01 3/15 AEB IRU -- Instrument Slack MECH H/W P2 INTEGRATION & TEST 2 12/22 PROBE SUBSYSTEM HARDWARE Swap out AVIONICS B/U SHIP to UCB MECH BUILDUP BUS MECH & AVIONICS BUILD UP (Swales) 2/08 12/05 11/13 1/04 7/18 10/20 9/14 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL FM1 Instruments 2/09 9/28 3/14 MECH H/W AEB IRU FLT 3 BAU P3 INTEGRATION & TEST 3 1/09 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB MECH BUILDUP BUS MECH & AVIONICS BUILD UP (Swales) 9/09 1/10 2/13 10/17 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 9/28 2/14 3/28 MECH H/W AEB & IRU FLT 4 BAU P4 INTEGRATION & TEST 4 1/25 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 9/23 1/26 2/22 11/03 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 2/23 11/01 4/07 FLT 5 BAU MECH H/W AEB & IRU P5 INTEGRATION & TEST 5 2/10 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 10/12 2/13 3/09 11/23 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 3/10 11/01 4/19 6 P2- P5 SHIP TO JPL SHIP to JPL 4/25 PROBE VIB 7 PCA INTEGR 5/19 SETUP / PROBE VIB / PCA INTEGR. (JPL) 5/16 PCA VIB/ACOUSTICS PROBE THERMAL 6/13 8 PCA VIB / ACOUSTICS / THERMAL (JPL) 5/31 9 MAG / SPIN BAL./ P1-5 PACK 6/21 MAG & MASS PROP (JPL) / SHIP MISSION CONTINGENCY IIRT CONTINGENCY 8/10 10 MISSION RESERVE 6/22 10 DAYS 26 DAYS 10/19 ASTROTECH 11 LAUNCH PROCESSING/LAUNCH 8/11

  6. RFA Status RFAs In Work

  7. RFA Status Complete w/o Concurrence

  8. RFA Status Complete w/o Concurrence