80 likes | 213 Views
THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS FM1 Instrument Pre-Ship Review University of California, Berkeley September 21, 2005. Conference Rooms. Main Conference Room.
E N D
THEMIS • TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS • RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START • THEMIS • FM1 Instrument Pre-Ship Review • University of California, Berkeley • September 21, 2005
Conference Rooms Main Conference Room • Coffee, and food at Silver Addition Main Entrance (outside) • Splinter room in Silver Annex Conference • Parking Passes, see Daniele • Other issues, see:Vassilis Angelopoulos or Peter Harvey Silver Addition Samuel Silver Space Sciences Laboratory Silver Annex For maps, etc. go to http://www.ssl.berkeley.edu/
Agenda • AGENDA
THEMIS FM1 INSTRUMENT SUITE • PRE-SHIP REVIEW (PSR) • INTRODUCTION • Peter R Harvey • THEMIS Project Manager • University of California - Berkeley
Mission Schedule THEMIS Bus, Instrument & Mission I&T Schedule PROJECT MGR. : PETER HARVEY STATUS AS OF: 9/01/05 MISSION MGR. : FRANK SNOW CY 2004 CY 2006 CY 2005 Probe Delivery MILESTONES M J M J A N D J F M A J A S O N D J F M A J S O CRR 2/04 4/22 CR @ HQ P1 PER 12/12-13 P2-P5 PER 4/20 MAJOR REVIEWS P1 Test Review FGM/SCM CDR 4/06-08 PSR 6/20-21 3/01-15 4/19-20 INSTRUMENT CDR 6/14-18 MISSION CDR BAU EDU#2 FLT 1 BAU P1 INTEGRATION & TEST AEB MECH H/W IRU 1 11/17 LEGEND 9/20 PROBE SUBSYSTEM HARDWARE AVIONICS B/U Swap out -- Intermediate Slack SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 5/02 6/09 C/O PROBE I&T -- Project Reserve BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL SHIP to JPL P1 Test Review 10/12 9/21 12/15 ENVIRONMENTALS -- Critical Path H/W ENVIRONMENTAL TEST & CLOSEOUTS (JPL) BAU EDU#1 FLT 2 BAU 3/01 3/15 AEB IRU -- Instrument Slack MECH H/W P2 INTEGRATION & TEST 2 12/22 PROBE SUBSYSTEM HARDWARE Swap out AVIONICS B/U SHIP to UCB MECH BUILDUP BUS MECH & AVIONICS BUILD UP (Swales) 2/08 12/05 11/13 1/04 7/18 10/20 9/14 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL FM1 Instruments 2/09 9/28 3/14 MECH H/W AEB IRU FLT 3 BAU P3 INTEGRATION & TEST 3 1/09 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB MECH BUILDUP BUS MECH & AVIONICS BUILD UP (Swales) 9/09 1/10 2/13 10/17 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 9/28 2/14 3/28 MECH H/W AEB & IRU FLT 4 BAU P4 INTEGRATION & TEST 4 1/25 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 9/23 1/26 2/22 11/03 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 2/23 11/01 4/07 FLT 5 BAU MECH H/W AEB & IRU P5 INTEGRATION & TEST 5 2/10 PROBE SUBSYSTEM HARDWARE AVIONICS B/U SHIP to UCB BUS MECH & AVIONICS BUILD UP (Swales) MECH BUILDUP 10/12 2/13 3/09 11/23 PROBE I&T & C/O BUS/INSTRU MECH & ELEC I&T & C/O (UCB) INSTRU COMPL 3/10 11/01 4/19 6 P2- P5 SHIP TO JPL SHIP to JPL 4/25 PROBE VIB 7 PCA INTEGR 5/19 SETUP / PROBE VIB / PCA INTEGR. (JPL) 5/16 PCA VIB/ACOUSTICS PROBE THERMAL 6/13 8 PCA VIB / ACOUSTICS / THERMAL (JPL) 5/31 9 MAG / SPIN BAL./ P1-5 PACK 6/21 MAG & MASS PROP (JPL) / SHIP MISSION CONTINGENCY IIRT CONTINGENCY 8/10 10 MISSION RESERVE 6/22 10 DAYS 26 DAYS 10/19 ASTROTECH 11 LAUNCH PROCESSING/LAUNCH 8/11
RFA Status RFAs In Work
RFA Status Complete w/o Concurrence
RFA Status Complete w/o Concurrence