An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FACILITIES PLANNING & OPERATIONS“Facilities Update”April 20, 2010

  2. 1 12 22 33 2 13 23 34 3 14 24 35 Chief Engineer 4 15 25 36 5N 5/6 16 26 37 7 17 27 38 Senior Engineer 8 18 28 39 9 19 29 43 20 10N 10 30 44 21 11 Maintenance Engineer 31 DO JANUARY 2010 AUGUST 2009 APRIL 2009 JUNE 2008 JANUARY 2008 JULY 2011 JANUARY 2009 TOTAL SQ. FT = 554,243 79,177 PER ENGINEER TOTAL SQ. FT = 565,719 94,286 PER ENGINEER TOTAL SQ. FT = 548,605 91,434 PER ENGINEER TOTAL SQ. FT = 627,832 89,690 PER ENGINEER TOTAL SQ. FT = 550,869 78,696 PER ENGINEER TOTAL SQ. FT = 653,719 93,388 PER ENGINEER TOTAL SQ. FT = 724,581 103,511 PER ENGINEER Utility Engineer

  3. 1 3E 10 19 Chief Engineer 2 4N 11N 20 3 5 14 21 3A 6 15 22 Senior Engineer 3B 7 16 23 3C 8 17 24 3D 9 18 Maintenance Engineer JANUARY 2008 JANUARY 2011 AUGUST 2009 MAY 2010 Total Sq Ft = 469,985 78,331 per Engineer Total Sq Ft = 542,984 90,497 per Engineer Total Sq Ft = 462,985 77,164 per Engineer Total Sq Ft = 446,985 89,397 per Engineer Utility Engineer

  4. 1 13 2 16 Chief Engineer 3 17 5 18 6 19 Senior Engineer 7 20 8 21 9 22 Maintenance Engineer JANUARY 2008 JULY 2009 AUGUST 2008 DECEMBER 2008 MAY 2009 TOTAL SQ. FT = 287,787 71,947 PER ENGINEER TOTAL SQ. FT = 303,506 75,876 PER ENGINEER TOTAL SQ. FT = 296,856 74,214 PER ENGINEER TOTAL SQ. FT = 303,506 75,876 PER ENGINEER TOTAL SQ. FT = 345,301 86,325 per Engineer Utility Engineer

  5. 1 12 22 33 2 13 23 34 3 14 24 35 Lead Custodian 4 15 25 36 5/6 5N 5/6 16 26 37 Day Shift Custodians 7 17 27 38 8 18 28 39 9 19 29 43 10N 10 20 30 44 11 21 31 DO APRIL 2009 JUNE 2008 AUGUST 2009 JANUARY 2010 JULY 2011 JANUARY 2009 JANUARY 2008 CSF = 491,232 30,702 PER FTE CSF = 455,546 28,471 PER FTE CSF = 464,088 30,939 PER FTE CSF = 452,749 30,183 PER FTE CSF = 451,858 30,124 PER FTE CSF = 541,714 36,114 PER FTE CSF = 598,385 39,892 PER FTE Swing Shift Custodians

  6. 1 13 2 16 Lead Custodian 3 17 5 18 6 19 Day Shift Custodian 7 20 8 21 9 22 Swing Shift Custodian AUGUST 2011 JANUARY 2008 AUGUST 2008 DECEMBER 2008 MARCH 2009 MAY 2009 AUGUST 2009 CSF = 223,339 20,303 PER FTE CSF = 217,935 19,812 PER FTE CSF = 217,935 21,793 PER FTE CSF = 223,935 22,393 PER FTE CSF = 227,705 25,300 PER FTE CSF = 229,292 20,844 PER FTE CSF = 254,500 28,278 PER FTE

  7. 1 3E 10 19 Lead Custodian 2 4N 11N 20 3 5 14 21 3A 6 Day Shift Custodian 15 22 3B 7 16 23 3C 8 17 24 3D 9 18 Swing Shift Custodians MAY 2010 JANUARY 2011 AUGUST 2009 JANUARY 2008 JANUARY 2010 CSF = 395,782 28,270 PER FTE CSF = 411,813 31,678 PER FTE CSF = 417,605 29,829 PER FTE CSF = 395,782 28,270 PER FTE CSF = 478,395 34,171 PER FTE

  8. JANUARY, 2008 151 Acres / 7 = JANUARY, 2009 146 Acres / 6 = January, 2010 146 Acres / 6 = JULY, 2011 147 Acres / 6 = Lead Groundskeeper 24.5 22 24 24 Groundskeepers

  9. JANUARY, 2008 105 Acres / 3 = JANUARY, 2011 104 Acres / 3 = 35 35 Lead Groundskeeper Groundskeepers

  10. JANUARY, 2008 128 Acres / 3 = AUGUST, 2009 128 Acres / 3 = 43 43 Lead Groundskeeper Groundskeepers

  11. FACILITIES STAFFING SUMMARY

  12. New/Additional FPO Expenses • Custodial Supplies • Paper products • Non-paper products • Maintenance Supplies • Air filters • Fan belts • Batteries • Lighting (interior and exterior) • Universal Network Controllers (UNCs) • Testing and Certifications • Every 5 years • Fire Sprinkler and Backflow Certification • Electrical Load Center Certification • Every year • Fire Pump Testing and Overhaul • Fire Extinguisher Inspections • Rollup Door Inspections • Elevator inspections/permits

  13. Scenario – Cañada College • Chiller – from $1500 per year for water treatment of the old chiller, it’s increased to around $12K per year for the new one; plus new annual maintenance/service agreement of $10K • Air filters for air handling units – increased from 19 to 42 = additional$6K for semi-annual change; or $12K for required quarterly change • V-belts for air handling units – exhaust fans has increased from 52 to 72 = additional $2500 per year • Batteries for fire life safety devices and ACAMS – roughly additional $5K per year • Lighting – 130 new parking lot and walkway lights installed = roughly additional $3K per year to replace fixtures

  14. Recurring Maintenance Costs • Maintenance and Service • Fire, Life and Safety Systems • Access Controls and Video Surveillance Systems • Co-generators • Building Management System • Elevators (additional elevators) • Chillers • Boilers

  15. Budgeted vs. Actual Expenses