An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Multiple Indicator Cluster SurveysSurvey Design Workshop General Structure of a Survey Plan MICS4 Survey Design Workshop

  2. Country Survey Plan • Country teams will be required to draft and present a ‘country survey plan’ on the last day of the workshop MICS4 Survey Design Workshop

  3. Country Survey Plan • 5-10 minutes presentations • Presentation by the UNICEF officer or the survey coordinator • Followed by short general discussion • There will be preparatory discussion and group work MICS4 Survey Design Workshop

  4. Country Survey Plan • Sessions specifically allocated to group work on Country Survey Plans MICS4 Survey Design Workshop

  5. Country Survey Plan • Power point presentation is encouraged • Handouts are optional • Please copy all power point presentations to the workshop laptop • All presentations will be copied to USB disks that will be distributed to all participants MICS4 Survey Design Workshop

  6. Country Survey Plan • Between now and the time of your presentation, facilitators will work with groups of countries both during workshop hours and after the workshop hours, if needed • Bilateral meetings will also be organized to meet with country teams, if needed • Country teams will use ‘Country Survey Plan’ Template to develop/finalize their plans [Word file - MICS4 Country Survey Plan Template.doc] MICS4 Survey Design Workshop

  7. Presentations • Countries planning a MICS • Initial or draft ‘Country Survey Plan’ is expected to be presented • A revised ‘Country Survey Plan’ is expected to be submitted after the workshop MICS4 Survey Design Workshop

  8. Presentations • Countries planning a mixed survey • MICS-DHS, • DHS-MICS, • MICS-other, or • Other cases • Initial plans and preparations for surveys MICS4 Survey Design Workshop

  9. Presentations • Countries not planning a survey and/or recently completed one • May present summary information on • completed surveys • content • data availability • future data collection plans MICS4 Survey Design Workshop

  10. CSP should answer…. • Implementing agency, MICS/Survey Team and Governance Structure • Questionnaires • Which modules will be retained, which modules will not be used? • Any issues regarding specific questions or question groups? MICS4 Survey Design Workshop

  11. CSP should answer…. • Sampling • What will be the sample size? • Sample frame? Updating necessary? • What will be the general design characteristics of the sample? • What will be the level of aggregation? MICS4 Survey Design Workshop

  12. CSP should answer…. • Survey Instruments Needed • Equipment and supply needs • Training of Fieldwork Staff • Timing, participants, length • Fieldwork • Timing, constraints, team composition, duration, logistics, monitoring MICS4 Survey Design Workshop

  13. CSP should answer…. • Data Entry and Data Processing • Timing, data entry team, duration, monitoring • Budget • How much will the MICS4/major budget line items cost? • Available funding and funding needs • Budget template [excel file] will be available [Separate session on budget calculations] MICS4 Survey Design Workshop

  14. CSP should answer…. • Timetable • What is the timetable envisaged for MICS4 activities? [Separate session on Timetable] • Major Challenges and Support from UNICEF • What are the major challenges? • What kind of technical support will be needed? In what areas? Who from? MICS4 Survey Design Workshop

  15. ‘Getting Started’ Document • General information • Tables • Timetable template • Budget template • Costing framework Next session: Timetable and Budget Calculations MICS4 Survey Design Workshop