1 / 16

Yards Creek Overview

Asia-Pacific Partnership . on. Clean Development and Climate. Yards Creek Overview. Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007. J. Geuther, Manager Yards Creek. Yards Creek Overview. 400MW Pumped-Storage Station 3 Identical Units

rachelle
Download Presentation

Yards Creek Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Asia-Pacific Partnership on Clean Development and Climate Yards Creek Overview Asia Pacific PartnershipUnited States of AmericaPower Generation Task ForceAugust 13 – 17, 2007 J. Geuther, Manager Yards Creek

  2. Yards Creek Overview • 400MW Pumped-Storage Station • 3 Identical Units • Commissioned 1965 • Three year Construction • Jointly Owned • Remotely Dispatched Yards Creek Overview 2

  3. Yards Creek Overview • Upper Reservoir • 163 Acres • 4763 AF Power Storage • 49’ Elevation Variation • Lower Reservoir • 302 Acres • 4763 AF Power Storage + Seasonal Storage • 18’ Elevation Variation • Auxiliary Reservoir • 380 AF Seasonal Storage Yards Creek Overview 3

  4. Yards Creek Overview • 3000MWH Energy Storage • Peak Load Generation • Load Regulation • Voltage Support • Black Start Capability Yards Creek Overview 4

  5. Equipment Suppliers • BLH Pump-Turbines—American Hydro Runners • Pelton Governors • GE Motor-Generators—National Electric Coil Rewinds • GE EX2000 Voltage Regulators • Allis-Chalmers Spherical Valves • Siemens 3AF Vacuum 14.4kv Generator Breakers • Siemens 230kv GCB’s • Westinghouse 144MVA Step-up Transformers • Delta Star 230kv Phase Reversal Switches • 375kva Emergency Generator Yards Creek Overview 5

  6. Operation • Upgraded Pump-Turbines—6% Efficiency Gain • 750,000+MWH Annual Generation • Equivalent Forced Outage Rate (EFOR) < 1% • High Starting Reliability Yards Creek Overview 6

  7. Daily Cycling • 7 hours Generation at Maximum Output • 9 hours to refill Upper Reservoir • 600 Generate Starts/Year per Unit Yards Creek Overview 7

  8. Staffing • On-site Staffing • 6 Hydro-Technicians • 1 Administrative • 2 Management • Corporate Support • Engineering • Environmental • Administrative • IT • Legal • Other • Contract Labor Services • Security Services Yards Creek Overview 8

  9. Priorities • Safety • Environmental and Regulatory Compliance • Federal Energy Regulatory Commission (FERC) • New Jersey Department of Environmental Protection (NJDEP) • Delaware River Basin Commission • Reliability • Cost Effective Operations Yards Creek Overview 9

  10. Operations • Remotely Dispatched from Reading, PA. • Automated with Local Operation Capability • Alarms are Remotely Telemetered • Reservoir Levels are Remotely Telemetered • 5 Minute Generate Starting • 10 Minute Pump Startup—Across Line Start Yards Creek Overview 10

  11. P/G Cycle Efficiency • Original = 67% • New Runners = 73% Yards Creek Overview 11

  12. Significant Projects • Pump-Turbine Upgrades – 70 MW increase • Unit No. 1 1995 • Unit No. 2 1993 • Unit No. 3 1996 • Motor-Generator Rewinds • Unit No. 1 1996 • Unit No. 2 1997 • Unit No. 3 1996 • 230kv Gas Circuit Breaker Replacements • Unit No. 1 2005 • Unit No. 2 2005 • Unit No. 3 2006 Yards Creek Overview 12

  13. Significant Projects • Voltage Regulator Replacement • Unit No. 1 2001 • Unit No. 2 2001 • Unit No. 3 2001 • Penstock Interior Inspection and Painting--1995 Yards Creek Overview 13

  14. Turbine Upgrades • Replacement runners • Modified/new wicket gates • Modified stayvane • Modified draft tube • New wicket gate linkage • Reinforcement of stayring bolting flange • Greaseless wicket gate bushings Yards Creek Overview 13

  15. Stator Rewinds • Unplanned Outages after20yrs Service • Achieved IncreasedCapability Yards Creek Overview 14

  16. 230kv GCB Replacement • Unplanned Outages after 20yrs Service • Achieved Increased Capability Yards Creek Overview 15

More Related