Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle

Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle. Owen Kehoe, PE, PTOE Transportation Engineer Speed & Reliability Group King County Metro Transit Seattle, WA. Background. Speed & Reliability Group Special projects, improve existing service

rad
Download Presentation

Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation Engineer Speed & Reliability GroupKing County Metro Transit Seattle, WA

  2. Background • Speed & Reliability Group • Special projects, improve existing service • Traffic Engineering background • Work with local DOT’s • Transit in Downtown Seattle: • 5000+ daily buses on 5 Avenues • Bus Tunnel

  3. Background • 2-year Bus Tunnel Closure • Buses diverted to surface streets • 3rd Avenue: Two way, Four Lanes • Skip Stop operation: Blue & Yellow Zones • General Traffic Restricted: Right-Turn Only AM/PM Peak • 2nd & 4th Avenues: One way with transit lane • Tunnel opening September 2007 • Traffic restrictions remain on 3rd Avenue • Shift additional routes to 3rd Avenue • How many buses can we load onto 3rd Avenue?

  4. Too Many!

  5. How Many Buses? • Methodology presented in TCRP TCQS Manual • Bus Stop Capacity • Bus Lane Capacity • Developed custom worksheet • Need to automate, user-friendly • Uses available input data • Dialog with transit planning staff • Focus on PM peak condition • 3rd Avenue, NB & SB • 2nd Avenue, SB only

  6. Bus Stop Capacity Main Inputs Calculations Output # of Loading Areas Dwell Time Signal Timing Clearance Time Right-Turn traffic 25% Failure Rate Capacity buses/hr

  7. 3rd Ave Identify Critical Bus Stops NB Bus stop capacity 83 bus/hr Refine Dwell Time & Clearance Time measurements Pine St 81 bus/hr Pike St Union St 114 bus/hr Blue Zone Capacity: 75 buses/hr Yellow Zone Capacity: 80 buses/hr University St Seneca St 139 bus/hr Spring St Madison St 90 bus/hr Marion St Columbia St 107 bus/hr Cherry St James St 136 bus/hr

  8. Bus Lane Capacity Main Inputs Calculations Output Adjacent Lane traffic Bus Lane Capacity buses/hr Blue Zone Capacity Yellow Zone Capacity

  9. 3rd Ave Pine St Pike St Union St NB Third Avenue Capacity: 140 buses/hr Blue Zone Capacity: 75 buses/hr Yellow Zone Capacity: 75 buses/hr University St Seneca St Spring St Blue Zone Capacity: 75 buses/hr Yellow Zone Capacity: 80 buses/hr Madison St SB Third Avenue Capacity: 140 buses/hr Marion St Columbia St Cherry St James St

  10. End Results • Compared bus volume to capacity • Assigned routes to 3rd Avenue • Just enough buses/hr added • Skip-stops well-balanced • Future Planning • Identify improvements to increase capacity • BRT service integration • Triple skip stop pattern?

  11. Key Lessons Learned • Planning bus stop capacity for reliability • Maximize use of transit priority streets • Tool for planning/scheduling routes • Balance: bus volume vs. reliability • Capacity = limit for acceptable reliability • Failure Rate sets reliability level • Critical bus stops are key • Analysis/data collection efforts • Capacity improvements