1 / 10

State of Arkansas Network Upgrades

State of Arkansas Network Upgrades . Running more bandwidth for less dollars . Next Generation State Network. Replace current State Network technology (Frame Relay and ATM) used since the early 1990’s Bid opened on October 11, 2010

rafael
Download Presentation

State of Arkansas Network Upgrades

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State of Arkansas Network Upgrades Running more bandwidth for less dollars

  2. Next Generation State Network • Replace current State Network technology (Frame Relay and ATM) used since the early 1990’s • Bid opened on October 11, 2010 • Previously delayed bidding a Multi Protocol Label Switching (MPLS) network because of cost. Quotes were 10 – 12% higher than current costs. • Wide Area Network (WAN) Ethernet is now more cost effective than other technologies • DIS bid a vendor a MPLS backbone with WAN Ethernet and Point to Point Protocol (PPP) connectivity to end sites DIS ARE-ON Update

  3. More cost effective bandwidth with many more bandwidth options • More Quality of Service (QoS) options (min 4) • More robust and redundant backbone • Scheduled to award November 2010 • Will require buildout of vendor networks to meet state needs • DIS will work with vendors to schedule conversions as vendor networks are ready DIS ARE-ON Update

  4. Convert an area at a time to reduce travel time to agency sites and disconnect existing leased backbone circuits as soon as clear • Should take 18-24 months to complete move after start date • Site growth can be managed outside of conversion schedule if vendor is ready • Replace rented site routers with next generation devices as each site is converted DIS ARE-ON Update

  5. Consumer Class Internet • Provides high bandwidth solutions with lower service level options for non-business critical Internet applications • Bid issued and will open on November 1, 2010 • Can be used to aggregate Internet traffic between business critical (State Network) and non-critical (Consumer Class Internet) based on destination IP • Aggregation achieved in the site router or in a device that provides for ease of user administration, failover, and dashboard features DIS ARE-ON Update

  6. A BEE (Bandwidth for Educational Enhancement) Initiative project started with six (6) K-12 schools to test concept DIS ARE-ON Update

  7. Will test ECESSA and FatPipe aggregation devices and an appliance from M86 (Internet content filter provider) for content filtering • Some agencies may use service as only Internet service or for public use Internet access (example - Parks and Tourism) DIS ARE-ON Update

  8. State Video Network • State video network in place since early 1990’s • The bridging and scheduling has been outsourced to AT&T since inception and is now in the third generation • Currently providing approximately 26,000 site hours/month with 550 end point systems • Current contract has one 12 month extension remaining as of February 2011 • Concern about high cost of current bridging and scheduling with our vendor • Today our vendor has bridges in four (4) Central Offices managing both IP and 85 non-IP (H.320) video systems DIS ARE-ON Update

  9. With one large bridge and no H.320 systems the costs could be significantly reduced • Most H.320 systems are relatively new and can handle IP video. • Providing for H.320 bridging will increase the bridging hardware cost by 40% • Should DIS rebid soon (E-rate available) or purchase (no E-rate) with a proposed cutover in June 2011 (after spring school term) • DIS applied for $500K RUS grant • Awarded grant could be used to reduce purchase price DIS ARE-ON Update

  10. Owning would allow for more rate flexibility to accommodate new video services • If purchased, DIS would need to plan a revenue stream for four-five (4-5) years to cover investment • A video sub-committee of the State Network Working Group will address future needs and direction of the State Video Network • The group represents current video users and is chaired by Solomon Graves from the Arkansas Parole Board DIS ARE-ON Update

More Related