1 / 9

USATLAS Tier 1 & 2 Networking Meeting Scott Bradley Manager, Network Services

USATLAS Tier 1 & 2 Networking Meeting Scott Bradley Manager, Network Services 14 December 2005. Tier2 Center. Tier2 Center. Tier2 Center. Tier2 Center. Tier2 Center. HPSS. HPSS. HPSS. ATLAS Distributed Computing Model.

rahim-koch
Download Presentation

USATLAS Tier 1 & 2 Networking Meeting Scott Bradley Manager, Network Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USATLAS Tier 1 & 2 Networking Meeting Scott Bradley Manager, Network Services 14 December 2005

  2. Tier2 Center Tier2 Center Tier2 Center Tier2 Center Tier2 Center HPSS HPSS HPSS ATLAS Distributed Computing Model CERN:Outside Resource Ratio ~1:2Tier0:( Tier1):( Tier2) ~1:1:1 ~PByte/sec Online System <GBytes/sec ATLAS Experiment CERN ~5M SI2K >1 PB Disk Tape Robot Tier 0 +1 Castor ~10 Gbits/sec Tier 1 BNL: ~2M SI2K; 2PB Tape Robot IN2P3 Center INFN Center RAL Center HPSS 2.5 Gbps Tier 2 ~2.5 Gbps Tier 3 Tier 0: DAQ, reconstruction, archive Tier 1: Reconstruction, simulation, archive, mining and (large scale) analysis Tier 2+: Analysis, simulation Tier 3+: Interactive analysis Institute Institute Institute Institute 100 - 1000 Mbits/sec Physics data cache Tier 4 Workstations

  3. HEP/NP WAN Requirements at BNL

  4. Questions/Comments ???

  5. Purpose of the Meeting… • To Provide USATLAS Tier 2 Network Planners as much information as possible to prepare for: • SC-4 scheduled for ~ 4/06. • ATLAS production scheduled to begin ~ 4/07.

  6. …With the Desired Outcome of: • Answering Tier 2 Questions • Providing Guidance • Establishing Relationships • Determining Next Steps

  7. …The Punchline: Tier 2’s, This is Your Meeting!

  8. Agenda 08:00-08:30 Continental Breakfast  08:30-08:40 Welcome, Administrative Remarks Scott Bradley BNL  08:40-09:00 USATLAS Computing Model Overview Razvan Popescu BNL  09:00-09:40 USATLAS Network Model Overview John Bigrow BNL  09:40-10:00 ESnet Peering Arrangements Mike O’Connor ESnet  10:00-10:20 Abilene Peering Arrangements Chris Heermann Internet2  10:20-10:40 Break  10:40-11:00 Ultralight Update Shawn Mckee U Mich  11:00-11:20 QoS/MPLS Capabilities Dantong Yu BNL  11:20-11:40 Network Performance Measurement Joe Metzger ESnet 11:40-12:00 Summary of Morning Work, Q & A Scott Bradley BNL 12:00-1:00 Working Lunch  1:00-2:30 Chicago Tier 2 Update Robert Gardner U Chicago BU/HU Tier 2 Update Saul Youssef BU Southwest Tier 2 Update TBD TBD  2:30-3:30 Capture of Open Issues, Action Items, Next Steps  3:30-4:00 Working Break, Creation of Slides  4:00-5:00 Summary of Next Steps, Assignment of Responsibility for Action Items  6:00- Dinner for all interested (?)

  9. Action Items/Next Steps

More Related