1 / 9

Advanced Reservoir Engineering Homework #2

Advanced Reservoir Engineering Homework #2. 學生:陳逸軒 N46021101 授課教授:謝秉志. Homework #2. Using the p/z plot to estimate cumulative gas production. The initial reservoir pressure was 4200 psia , with a temperature of 180 °F .

Download Presentation

Advanced Reservoir Engineering Homework #2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced Reservoir EngineeringHomework #2 學生:陳逸軒 N46021101 授課教授:謝秉志

  2. Homework #2 • Using the p/z plot to estimate cumulative gas production. • The initial reservoir pressure was 4200 psia, with a temperature of 180°F. • The reservoir has been producing for some time. Some pressure surveys have been made at different times: A dry gas reservoir contains gas of the following composition:

  3. Homework #2 • What will be the cumlative gas production when the average reservoir pressure has been dropped to 2000 psia? • Assuming the reservoir rock has a porosity of 12%, the water saturation is 30%, and the reservoir thickness is 15 ft, how many acres does the reservoir cover?

  4. Homework #2 - Solution • 利用已知 p/z 對 Gp之關係作圖。 • 取其趨勢線方程式: Y = -900X + 4600 Y=0 X=5.1111111 • 本構造之OGIP為 5.11 MMM SCF • 接著計算 2000psia 下之Z值。

  5. Homework #2 - Solution Ppc=0.75×673.1+0.20×708.3+0.05×440.1 =668.49 Tpc=0.75×673.1+0.20×708.3+0.05×440.1 =404.07 Ppr= 2000/668.49 = 2.99 Tpr= 640/404.07 = 1.58

  6. Homework #2 - Solution Ppr= 2.99 Tpr= 1.58 查表得 2000 psia 下之Z值為0.815 則 p/z=2000/0.815=2454

  7. Homework #2 - Solution p/z = 2000/0.815 = 2454 由右表可得 Gp = 2.38 MMM SCF

  8. Homework #2 • What will be the cumlative gas production when the average reservoir pressure has been dropped to 2000 psia? • Assuming the reservoir rock has a porosity of 12%, the water saturation is 30%, and the reservoir thickness is 15 ft, how many acres does the reservoir cover?

  9. Homework #2 - Solution • 計算 4200psia 下之Z值。 Ppr= 4200/668.49 = 6.28 Tpr = 1.58 查表取得 4200 psia 下之Z值為0.898

More Related