1 / 5

GND noise snapshot on Dec 3 rd , 2008 – 10h00,12h30

4. 3. 2. 1. 7. 6. 8. 9. 5. 14. 10. 11. 12. 13. GND noise snapshot on Dec 3 rd , 2008 – 10h00,12h30. Ground noise at ALICE pit. Noisy ventilation OFF Frequency range 9kHz – 100MHz 91550-1 current probe and Rohde Schwarz spectrum analyzer. GND Ref1: cable from LHC tunnel A side

raina
Download Presentation

GND noise snapshot on Dec 3 rd , 2008 – 10h00,12h30

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4 3 2 1 7 6 8 9 5 14 10 11 12 13 GND noise snapshot on Dec 3rd, 2008 – 10h00,12h30 Ground noise at ALICE pit Noisy ventilation OFF Frequency range 9kHz – 100MHz 91550-1 current probe and Rohde Schwarz spectrum analyzer

  2. GND Ref1: cable from LHC tunnel A side GND Ref2: lower cable from LHC service tunnel side A GND Ref3: upper cable from LHC service tunnel side A GND Ref4: cable from LHC service tunnel side C GND Ref5: cable at Muon red pillar I side GND Ref6: cable at dipole I side GND Ref7: cable at far end of Alice pit C, I sides

  3. GND Ref8: cable at Muon red pillar O side GND Ref9: cable at far end of Alice pit C, O sides GND Ref10: cable at dipole O side GND Ref11: cable at balcony A, O sides from top GND Ref12: cable at balcony A, O sides to bottom GND Ref13: cable below racks A, O sides GND Ref14: cables from inside solenoid A side

  4. GND Ref1: cable from LHC tunnel A side GND Ref2: lower cable from LHC service tunnel side A GND Ref3: upper cable from LHC service tunnel side A GND Ref4: cable from LHC service tunnel side C GND Ref5: cable at Muon red pillar I side GND Ref6: cable at dipole I side GND Ref7: cable at far end of Alice pit C, I sides

  5. GND Ref8: cable at Muon red pillar O side GND Ref9: cable at far end of Alice pit C, O sides GND Ref10: cable at dipole O side GND Ref11: cable at balcony A, O sides from top GND Ref12: cable at balcony A, O sides to bottom GND Ref13: cable below racks A, O sides GND Ref14: cables from inside solenoid A side

More Related