An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Set 7 due today • Set 8 due April 18 • C-3 due April 18 • Exam May 7

  2. Answers set 7: (1)Shortest Route

  3. 50 B M 15 10 55 P V 60 L 20 125 S

  4. Delete L-P, ADD PATHS FROM P

  5. Delete P-M,add path from m

  6. Delete P-V,add path from V

  7. Delete both M-B,V-B • L-S 125 • L-P 60 • L-P-M 70 • L-P-V 115 • L-P-M-B 120

  8. Answer to (2) PERT

  9. A 4 1 E B 3 C D F 2

  10. ES AND EF

  11. ANSWER TO (a) E(x)=12

  12. LF,LS

  13. LF,LS

  14. LF,LS

  15. LF,LS

  16. LF.LS

  17. LF,LS

  18. LF,LS

  19. SLACK

  20. ANSWER TO (b) CRITICAL PATH: C-D-E

  21. NORMAL TABLE • Kinderman Supplement, p 58 • Row 1.0 • Col .00

  22. Z = 1.00

  23. Answer to (c) P(finish project before deadline)= .84

  24. Excel • Class demo NOT same as assignment should be in memo format • Describe critical activities in sentence