Set 7 due today. Set 8 due April 18 C-3 due April 18 Exam May 7. Answers set 7: (1) Shortest Route. 50. B. M. 15. 10. 55. P. V. 60. L. 20. 125. S. Delete L-P, ADD PATHS FROM P. Delete P-M, add path from m. Delete P-V, add path from V. Delete both M-B,V-B. L-S 125
E N D
Set 7 due today • Set 8 due April 18 • C-3 due April 18 • Exam May 7
50 B M 15 10 55 P V 60 L 20 125 S
Delete both M-B,V-B • L-S 125 • L-P 60 • L-P-M 70 • L-P-V 115 • L-P-M-B 120
Answer to (2) PERT
A 4 1 E B 3 C D F 2
ANSWER TO (a) E(x)=12
ANSWER TO (b) CRITICAL PATH: C-D-E
NORMAL TABLE • Kinderman Supplement, p 58 • Row 1.0 • Col .00
Answer to (c) P(finish project before deadline)= .84
Excel • Class demo NOT same as assignment should be in memo format • Describe critical activities in sentence