1 / 9

TTA Activities on IMT-Advanced standardization

Global Standards Collaboration (GSC) 14. TTA Activities on IMT-Advanced standardization. DJey KIM (kdj@tta.or.kr) TTA. Highlight of Current Activities. ITU-R WP5D invited technology submission for IMT-Advanced standards.

ramiro
Download Presentation

TTA Activities on IMT-Advanced standardization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Global Standards Collaboration (GSC) 14 TTA Activities on IMT-Advancedstandardization DJey KIM (kdj@tta.or.kr) TTA

  2. Highlight of Current Activities • ITU-R WP5D invited technology submission for IMT-Advanced standards. • 3GPP and IEEE presented their intention to submit LTE-Adv. and IEEE 802.16m during past WP5D meetings through initial submission at Feb. WP5D meeting. • 3GPP submitted detailed technology description at June WP5D meeting. • 13 evaluation groups were registered as independent evaluation groups in order to evaluate candidate technologies against IMT-Adv minimum requirement. • Detailed evaluation will be discussed in 7th & 8th WP5D meetings in accordance with ITU-R WP5D schedule.

  3. TTA are actively involved in the IMT-Adv submission and evaluation activities. TTA endorsed LTE-Advanced submission as an organization partner of 3GPP at June WP5D meeting TTA also supports IEEE 802.16m technology for IMT-Advanced candidate technology. TTA registered as independent evaluation group, and provided technical contributions to WP5D e.g., C-code implementation of channel model, and clarification of channel model. TTA has actively participated in CJk-B3G collaboration. AWF and 3GPPs collaboration were agreed as work scope. SIG on Evaluation was established. 10 Joint contributions were made toward WP5D so far Highlight of Current Activities 3 Geneva, 13-16 July 2009

  4. Proposed Strategic Direction • It is very important for ITU-R WP5D to manage the IMT-Advanced standardization process on time. • Broadband networks are demanded for high-capacity services on newly identified spectrum at WRC-07. • Based on timely IMT-Adv. Work completion, WRC-11 preparation can be smooth • This concludes that IMT-Advanced standardization process should be maintained in a transparent and efficient manner. • The progress of works should be well documented • The works of proponents and evaluation groups should be well organized.

  5. Challenges • The difference of evaluation results • Multiple evaluation methods are specified for different perspectives of evaluation for IMT-Advanced RIT or SRIT. • ITU-R M.2135 didn’t specify every details on evaluation methodologies with consideration of different conditions required by different technologies. • The different understanding or implementation of evaluation methodology described in the Report ITU-R M.2135 by different evaluation groups. • It is difficult to calibrate evaluation methodologies among evaluation groups taking into account time and resource. • The ambiguity of consensus building(Step7) • After compliance assessment with minimum requirements at Step 6, consensus building and decision (step7) will begin. However, there is no clear definition & guideline on how to achieve objectives of “consensus building”.

  6. Next Steps toward IMT-Adv. Standardization • The efficient work under IMT.RADIO • Although scope and work plan for IMT.RADIO was proposed at the previous WP5D meeting, there are still different views. • However, TTA is of view that IMT.RADIO is needed for an interim document to smoothly connect evaluation discussion to ITU-R M.[IMT.RSPEC] development. • Therefore, TTA would like to propose that IMT.Radio should be developed towards a new IMT-ADV document under current workplan in order to facilitate consensus building process, while comprised of the summary of discussion on the evaluation of each candidate RIT/SRIT

  7. Supplementary Slides

  8. FIGURE A2-1 (IMT-ADV/2-E) Schedule for the development of IMT-Advanced radio interface Recommendations

  9. IMT-Advanced development process (ITU-R WP5D)

More Related