Interchange Distribution Calculator Working Group (IDCWG) Update. Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11, 2010. IDCWG Update. GTL Calculation Testing GTL Data Submission Change Order 283 Status. IDCWG Update. GTL Calculation Testing.
E N D
Interchange Distribution Calculator Working Group(IDCWG)Update Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11, 2010
IDCWG Update • GTL Calculation Testing • GTL Data Submission • Change Order 283 Status
IDCWG Update GTL Calculation Testing
IDCWG Update • GTL Calculation Testing – • Calculation Testing Sessions: • Test Plans Developed For GTL Calcs Prior To Test Sessions • October 5-7, 2010 in Minneapolis, MN (OATI) • October 11-15, 2010 in Minneapolis, MN (OATI) • Remote Testing Performed As Needed • Results: • No Outstanding Variances • Functional Testing Completed • CO-283 Developed As Specified
IDCWG Update GTL Data Submission
IDCWG Update • GTL Data Submission – • General Categories Of Data: • Generator MW’s • Load Zone MW’s • Branch Flows • Tie Flows • Phase Shifter (PAR) Taps • Variable Frequency Transformer (VFT) • DC Lines • Dynamic Schedules • Source Granularity • Sink Granularity • EMS\PSSE Mapping • Generator Block Load Dispatch
IDCWG Update • GTL Data Submission – • Full Data Load Submission: • Data Not Yet Being Submitted At Full Load Rate • Issues With Data Mapping and Data Validity Remain • Interconnection Participants Expect To Get To Full Load Submission By Mid-December • OATI Will Address Implementation Issues As They Arise
IDCWG Update Change Order 283 Status
IDCWG Update • Change Order 283 Status – • IDCWG Approved CO-283 As Implemented On November 1 • Data Submission Testing Will Continue For Participants • Developmental IDC Will Remain On Developmental Hardware • Once Full Load Submission Is Achieved, Developmental IDC Will Be Moved To Production Hardware To Be Operated In Parallel With Existing Production IDC
IDCWG Update Questions?