An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nicole Bryan1/31/2008AvionicsSensor Selection and Link Budget Analysis AAE 450 Spring 2008

  2. Sensors www.Digikey.com • This is the start of developing a complete power budget for use in battery selection. AAE 450 Spring 2008 Avionics

  3. Link Budget Analysis • Assumptions: • 8.5 x 107 bps data rate • 2 dB implementation loss factor • 1400 MHz to 1530 MHz • Better signal range • Feasible vehicle antenna sizes • Low power requirements Reference: Justin Rhodes, Nicole Bryan Calculations method: Professor Filmer AAE 450 Spring 2008 Avionics

  4. Possible Radio Frequencies Reference: FCC - http://www.fcc.gov/oet/spectrum/ AAE 450 Spring 2008 Avionics

  5. IMU Estimate Cost: $500-2000 Weight: 12 – 600g Reference: Danielle Yaple AAE 450 Spring 2008 Avionics

  6. Batteries Estimate Cost: < $10,000 Weight: 2.3-4.5 kg Reference: Danielle Yapl AAE 450 Spring 2008 Avionics