60 likes | 72 Views
Explore key milestones in LumiCal and BeamCal energy calibration, realistic simulation, background studies, clustering, tracking, digital calorimeter, and electronics. Learn about personnel, budget, and working groups at MPI Munich.
E N D
Milestones LumiCal simulation -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background studies, occupancy (2007) -Clustering (blind reconstruction) (2007) -tracking plane in front (2007/08) -digital calorimeter (2007) -crossing angle, magnetic field (2008) MPI Munich
Milestones BeamCal simulation -full simulation of BD algorithms, minimal set of layers (end 2006) -background backscattered in the central detector (2007) -concept fast readout scheme (2007) -test of algoriths for fast feedback (2007) MPI Munich
RO Electronics and sensors -test of amplifier from NCPHEP (2006) -Design and manufacturing for test beam use (2007/08) -test board for phy3, performance studies (2006) -technical design for RO (2007) -Radiation hardness studies (2006/07 ….) -readout-structure on sensor plane signal shape, cross talk, (2007) -Si, GaAs prototype sensors (2006/07) -TAU laboratory (2006/07) -israeli industry for si-sensor design, production (2006/07) MPI Munich
Personnel situation BNL: 0.7 FTE + Postdoc (req) Colorado: Cracow INP: Cracow Univ.: DESY: 2 FTE, 2 Postdocs, 2 Ph.D., 1 Dip.st. part time: electronics engineer JINR:2 part time FTE, 1 Ph.D. NCPHEP: 1 FTE, 1 Ph.D. Prague: 1 Ph.D. TAU: 1 Diploma, 1.5 FTE VINCA: 0.5 Ph.D. 0.5 FTE, Postdoc (req) Yale: MPI Munich
Budget (no personnel) BNL: Colorado: Cracow INP: Cracow Univ.: DESY: 50 – 80 k /year JINR: NCPHEP: Prague: TAU: VINCA: Yale: MPI Munich
Working groups -Beam Diagnostics (Ch. Grah, Bill) -Simulation BeamCal/LumiCal (Bogdan) -Sensors beam, tests (Wolfgang La.) - Readout electronics (Cracow) - Laser alignment, mechanics (Wojtek) MPI Munich