110 likes | 209 Views
The Team Challenge. O bjective. to work cooperatively as a team with the use of the team member cards. The Team Challenge. Your team challenge is to design and create a bridge from the resources available that will span a gap of at least 60cm.
E N D
Objective • to work cooperatively as a team with the use of the team member cards
The Team Challenge • Your team challenge is to design and create a bridge from the resources available that will span a gap of at least 60cm. • The winning bridge will be the one that can hold the largest weight. • Your group has a limited budget to purchase materials. Only the materials specialist can purchase materials. • The Materials Specialist may buy and sell between teams. • Should any teams draw the one spending the least will win. • Use your team worker cards appropriately • Use speaker cards during discussions • If you break the Health and Safety rules (6&7) the Health and Safety Executive will fine you. • If your team follows the Health and Safety rules well you might be awarded a bonus!
Timeline • 20 minutes planning time before the warehouse opens • 1 hour construction time • 10 minutes testing time
Resources • Fixing tape • Steel pipes • Pipe cutters • You have a budget of £86…… • Ready to start?
The Warehouse • Steel Pipes – 30 - £10 • Cutter hire - £20 for 10 mins • Fixing tape - £40 per roll
The Warehouse • Steel Pipes – 20 - £4 • Cutter hire - £4 for 10 mins • Fixing Tape- £5 per roll
The Warehouse Credit Crunch • Steel Pipes – 20 - £30 • Cutter hire - £45 for 10 mins • Fixing tape - £40 per roll