1 / 67

FLOOD RESCUE RELIEF & REHABLITATION SEP-2014.

FLOOD RESCUE RELIEF & REHABLITATION SEP-2014. A Presentation:. RAINY DAYS & IMPACT. FLASH FLOODS AREAS AFFECTED. Flash Floods - Occurred in Ferozpora Nalla ( Tangmarg ); Hapat Khai Nalla ( Boniyar ); Ningli Nalla and Mundari Nalla .

Download Presentation

FLOOD RESCUE RELIEF & REHABLITATION SEP-2014.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLOOD RESCUE RELIEF & REHABLITATIONSEP-2014. A Presentation:

  2. RAINY DAYS & IMPACT

  3. FLASH FLOODS AREAS AFFECTED • Flash Floods - Occurred in FerozporaNalla (Tangmarg); HapatKhaiNalla (Boniyar); NingliNalla and Mundari Nalla. • Caused inundation of various villages viz., Shrai, Ougmuna, Agrikalan, Hard Abura, BangilOusan, Heng, Karhamain TANGMARG TEHSIL. • Shrakwara, Wagoora, Vizer, Nilsar in WAGOORA TEHSIL. • Ahmadpura, Malbuchan, Tantraypora, Kongamdara, Hanjiwara,Trikulbal in PATTAN TEHSIL; • Panzipora, Ningli, Hartar, Haigham, Alibagh in SOPORE TEHSIL. • Kangriyal, Triknjan, Bela and Boniyar in TEHSIL BONIYAR. • Narwaw Area in BARAMULLA TEHSIL.

  4. FLASH FLOOD IMPACTS • Complete Submergence of Areas between MAGAM to HANJIWERA PAYEEN. • loss of two lives at Hard Abura. • Infrastructural damages--- 92 bridges, 250 roads, 2450 residential and non-residential structures, 234 water supply schemes, some electric lines and Standing Crops/ Fruit Orchards. • Damaged communication system .

  5. RESCUE, RELIEF & REHABLITATION AFTER FLASH FLOODS. • 25 Shikaras, 04 Motorized Boats were pressed in for rescue operations. • Tractors/Tippers were pressed in for evacuation people from inundated areas. • Rescue & Relief Camps were established where shelter, food, water & medicines were provided to affected people. • 8 people were rescued from FerozpurNalla at Shrai and 99 people from HapatkhaiNalla at BelaBoniyar. • Reasonable number of Sand bags were provided in such areas for protecting vulnerable breaches.

  6. Contd…, • Immediately adequate funds were released from Red Cross in favour of Tehsildar Boniyar, Tehsildar Baramulla ,Tehsildar Pattan, SDM Soporefor the relief works/ Operation of Community Langar to the tune of Rs. 1.5 lakhs. • An amount of Rs 10,000 each were released as relief from Red Cross for the two people who lost their lives at Hard Abura. • Immediate restoration of public utilities were pressed in. • Tents, Blankets, Medicines, Drinking Water etc., have been provided to affected families in these areas.

  7. POST-FLASH FLOOD APPROACH • Water levels increased above DANGER MARK at Isham, Sopore and Baramulla after 4th of September with continuous raining/Huge discharges out of Jehlum. • Continuous Monitoring: • Regular Co-ordinated visits were made in affected as well as vulnerable areas by Joint Teams of Civil & Police Administration. • Different Teams constituted by the District Administration regularly monitored the flood situation/relief operations in therir respective Jurisdiction on 24*7 basis. • Regular Advisories were issued in PucblicIntrest via., Radio, DDK and latter on through Local Electronic Media, Mobile PAS and Local Mosques.

  8. POST-FLASH FLOOD APPROACH, contd.. • Visiting Administrative teams pressed in for educating the people regarding flood situation and prospective evacuation. • Monetary Measures: • An amount of Rs 50 lakh has been released under SDRF by Govt. of J&K. • Rs 1 lakh each were immediately released in favour of SDM Sopore and Tehsildar Pattan for operating Relief Camp Kitchen. • Rs 15 lakh for SE R&B, 10 lakh for SE Hydraulics, 2 lakh for PDD have been released for immediate restoration of public utilities. • Rs 15 lakh are at disposal of ACR Baramulla for Relief purposes.

  9. Contd… • Preventive Measures: • More than 1.5 lakh sand bags were placed in inundated areas comprising of more than 60 villages of Baramulla District from Singhpora to Seer Jagir along the banks of River Jehlum. • 250 tents, 250 Blankets have been provided to affected people out of RED CROSS. • Water is being provided through water tankers at all affected places and Relief camps. • 1.3 lakh Chlorine tablets have been distributed in affected areas. • 15000 ORS packets along with other required Medicines have been distributed.

  10. CONTD..., Medical Facilities & Strategy: • PHC Boniyar has got inundated and Immediately alternative Hospital has been established in Tehsil Premises. • Anesthesia Specialist, Trauma specialists and Surgery Specialists have been attached to serve at District hospital Baramulla to cope up with the additional Patient Care and reduce referrals. • The surgery cases have doubled due rush of patients who used to go Srinagar for such services. • Shortage of Oxygen cylinders and surgical is the worry factor.

  11. RELIEF CAMP DETAILS.

  12. Communication Plan. • A joint Control of All Essential Utility Departments have been established at D.C. Office Complex. • Wireless Control Room at PCR Baramulla have been established. • All officials Incharge of Flood Rescue & Relief Operations have been provided with Wireless Communication system for better Co-ordination and effective relief Operation. • Co-ordinated Civil & Police Communication Plan and Joint Teams have been established in all areas.

  13. STOCK POSITION

  14. DAMAGE/ REQUIREMENT FOR TEMPORARY RESTORATION

  15. Department of R & B(Damage/ Requirement for Temporary Restoration)

  16. Department of PHE(Damage/ Requirement for Temporary Restoration)

  17. Department of I & FC(Damage/ Requirement for Temporary Restoration)

  18. Department of PDD(Damage/ Requirement for Temporary Restoration)

  19. PMGSY (Damage/ Requirement for Temporary Restoration)

  20. HEALTH SERVICES: (Damage/ Requirement for Temporary Restoration)

  21. DEPARTMENT OF EDUCATION: (Damage/ Requirement for Temporary Restoration)

  22. DEPARTMENT OF FISHERIES: (Damage/ Requirement for Temporary Restoration)

  23. Damages caused (Residential and Non-Residential Structures)

  24. AGRICUTURE & HORTICULTURTE(TEMPORARY DAMAGE ASSESMENT)

  25. ABSTRACT: Damage Assessment

  26. POSTIVES: • Co-Ordination between Civil & Police Administration. • Wireless Communication Plan. • Vulnerability mapping of potential breach areas and preventive measures taken thereof at appropriate time. • Immediate restoration of utilities started. • Special camp Directors to Manage Camp activities effectively.

  27. WORRY PERESPECTIVES. • Shortage of Petro Chemicals i.e., Diesel, Petrol, LPG, K- Oil. • Oxygen cylinder Shortage in District Hospital. • Shortage of Life Saving Drugs. • Communication lines. • Rising Water levels at Sopore and Baramulla. • Post- Flood Potential Epidemic Threat.

  28. SPECIAL THANKS... For efforts. • DIG NKR. • SSP Baramulla /Sopore and their Team. • SDM Sopore/Pattan and their Team. • TehsildarBoniyar/ Baramulla/Kohie. • SDPO Pattan. • SE R&B/PDD/Hydraulics and their Team.

  29. SOME GLIMPSES OF FLOOD, RESCUE & REHABILITATION (NARDWAW).

  30. Damages caused at Boniyar.

  31. Visit to MehrajporaSopore.

  32. Evacuation and Interaction : Relief Camp Dewar.

  33. People being educated w.r.t Floods at Pattan

  34. Water Supply & Protective BundingArchanderhama.

  35. Evacuation & Community Kitchen- A View (Parihaspora Relief Camp).

  36. BELA BONIYAR & SULTAN PORA.

  37. EVACUATION & RELIEF CAMP AT PATTAN.

  38. Video Glimpses: 1

  39. Video Glimpses: 2

  40. Day Wise Video Glimpses:

More Related