240 likes | 249 Views
Learn about the revised Hinsdale CSD Capital Project focusing on building renovations, security upgrades, bus garage renovations, nature study area, site work, and soccer field creation. Discover how this project brings opportunities while reducing costs. Get insights on cost allocations and the project's impact.
E N D
Hinsdale CSD Revised Capital Project , 2017-2019 Vision Statement: Hinsdale CSD will be a premier rural school district in New York State by 2020.
Attendees • BOE Hinsdale CSD • Jennifer Howell – President • Nanci Hurlburt – Vice President • John Fitzpatrick – Trustee • Jodie Noll – Trustee • Dan Adams - Trustee • Hodgson & Russ – Jeff Stone, Attorney • Clarke Patterson Lee – Ryne Wight, Architect • Bernard P. Donegan Inc.– Chris DeCarlo, Financial Analyst • HCS Faculty • Jennifer Jaquith – Business Manager • Larry Ljungberg – Superintendent
Unique Opportunity • Hinsdale is classified as a “High Needs, High Poverty” District as per NYSED • NYSED has allocated 95% aid for Capital Project • As a result, this project will have a $0 tax impact (no additional costs to local taxpayers).
NYS Building Aid • 95% of project costs will be covered by NYS building aid • This is due to the removal of the Concession Stand/Restroom building which was not eligible for funding • What about the other 5%? • The district will use $350,000 of savings plus additional debt service reserve funds to cover the 5% local share. These funds are currently held by the district.
Revised Capital Project • Scope reduced from $6.8 million to $4.9 million • Reduced cost impact on local residents to zero.
Revisions • Revised project does NOT include: • Track • Concession stand and restrooms • Dugouts • Fencing • Additional message board
Revised Project Cost Allocations • Building Renovations and Security Upgrades • Bus Garage Renovations • Nature Study Area and Site-work • Purchase of land adjacent to school/Creation of Soccer field
Building Renovations & Security • Refinish gym floors $ 80,000 • Refinish classroom floors [3] $ 22,000 • Interior door replacement for library and gyms $ 40,000 • Install Bilco door on basement entrance $ 7,500 • Electric panel upgrades $ 30,000 • Add cord reels in tech room $ 14,400 • Strobe lighting to meet code requirements $ 90,000 • LED lighting replacement $ 440,000 • Sound systems in both gyms $ 38,000 • Improvements to domestic water piping $ 250,000 • Install eyewash stations with drains $ 40,000 • Add a sink in the tech room $ 8,400
Building Renovations & Security Cont’d. • Replace 6 drinking fountains and add 2, all with bottle fill $ 48,000 • Add air conditioning to upper gym and ISS room $ 170,000 • Install bleachers in the upper gym $ 48,000 • Enclose rear canopy for athletic equipment storage $ 125,000 • Lightning protection $ 120,000 • Add salad bar in cafeteria $ 5,000 • Ventless kiln $ 60,000 • Interior work for natural gas conversion $ 70,000
Building Renovations & Security Cont’d. • Emergency backup power for computer circuits $ 75,000 • Additional security cameras $ 84,000 • Construct secure vestibule at main school entrance $ 100,000 • Additional access control on exterior doors$ 30,000 • Four emergency information monitors $ 7,500 • Construction Contingency $ 300,420 • Soft Costs (architect, financing, advertising, etc.) $ 460,644 Building Renovations and Security Costs $ 2,763,864
Bus Garage Renovations • Fueling canopy $39,000 • Interior LED lighting $55,000 • Additional security access control $10,000 • Replace concrete aprons at overhead doors $92,000 • Construction Contingency $29,400 • Soft Costs(architect, financing, advertising, etc.) $45,080 Bus Garage Renovations $270,480
Nature Study & Site work • Elevated wooden walkway to education pavilion $ 80,000 • Education Pavilion $ 50,000 • Misc. sidewalk replacement $ 24,000 • Front step replacement $ 39,000 • Natural gas line to school $ 30,000 • Construction Contingency $ 33,450 • Soft Costs(architect, financing, advertising, etc.) $ 51,290 Nature Study & Site work $ 307,740
Land Acquisition & Soccer Field • Student Safety-Regulation size and space beyond foul lines • Current area would only allow 5 feet between foul line along Rt 16 and the other foul line along the building • Decreased Transportation Costs-no longer need to transport students to Gile Hollow Park • Convenience for our families • All soccer games could be played at the school
Land Acquisition & Soccer Field • Land Acquisition $ 18,500 • Soccer field development such as grading, drainage, water service $ 700,000 • Soccer Field lighting $ 350,000 • Scoreboard with new steel structure $ 40,000 • Sound System with new steel structure $ 35,000 • Construction Contingency $ 171,525 • Soft Costs(architect, financing, advertising, etc.) $ 263,005 Land Acquisition & Soccer Field$ 1,578,030
Summary of Costs • CONSTRUCTION COSTS TOTAL $3,565,300 • 15% CONSTRUCTION CONTINGENCY $534,795 • TOTAL CONSTRUCTION COSTS $4,100,095 • 23% SOFT COSTS $ 820,019 • TOTAL PROJECT COSTS $4,920,114
Project Alternates • Install greenhouse [10’ by 20’] w/concrete pad and utilities 30,000 • Baseball dugouts (4 masonry with metal roofing) 140,000 • Tennis court resurfacing30,000 • Relocate existing soccer field bleachers to baseball field, with new pad 15,000 • Elevator code upgrades84,000 • Construction Costs $299,000 • 15% Construction Contingency44,860 • Total Construction Costs $343,850 • 23% Soft Costs 68,770 • Total Costs $412,620
SMART Schools Bond Act • Upgrade Phone System/Security $108,000 • Exterior strobe lighting $ 36,000 • Cooling System for Server Room $ 20,000 • Promethean Boards 10 @$4,500 $ 45,000 $209,000 • 100% NYS funded
Vote Date • Voting on the Capital Project will be held on: Tuesday, October 24, 2017 from 12:00 (noon) until 8:00 pm in the lower gym lobby entrance