Lafayette New Terminal Program Update

Lafayette New Terminal Program Update. April 11, 2018. Airside and Landside Site Analysis Terminal Facility Cost Schedule CMAR Coordination Next 60 days. Agenda. Overall Site Plan – April 2018. Meeting with Rental Car Agencies to review design scheduled for May 3, 2018. QTA. QTA.

Download Presentation

Lafayette New Terminal Program Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lafayette New Terminal Program Update April 11, 2018

  2. Airside and Landside Site Analysis • Terminal Facility • Cost • Schedule • CMAR Coordination • Next 60 days Agenda

  3. Overall Site Plan – April 2018

  4. Meeting with Rental Car Agencies to review design scheduled for May 3, 2018 QTA

  5. QTA

  6. Temporary RTR Cable October 2017 Temporary Cable April 2018 Temporary Cable

  7. Proposed RTR Facility Bell Helicopter Taxiway M Proposed RTR Facility ARFF

  8. 1st Floor Layout – April 2018

  9. 1st Floor Layout – April 2018

  10. 2nd Floor Layout – April 2018

  11. TSA, Security, LAC Office and Commission Rooms 2nd Floor Layout – April 2018 Concessions, SARA, Mother’s Room

  12. Terminal Program Budget • Current Estimate Budget

  13. Completed 30% design estimate reconciliation with the CMAR • Difference is statistically insignificant Estimate *Terminal Building cost does not include Landside or Airside Civil Site or Costs associated with the Quick Turn Around Facility

  14. Master Schedule

  15. 30% Cost Estimate Reconciliation • Design Coordination • Constructability Reviews • Progress Estimates • GMP • Multiple Packages to Coordinate with Funding Schedule • Timing and Procedures • Multiple GMPs based on bid packages • IGMP at 90% design CMAR Coordination

  16. Environmental Assessment - FONSI – May 1st • Release Enabling Demo and QTA Packages for bid • Review Terminal Airside Package • Review Terminal Building Package • Schedule Funding Meeting with LADOTD • Review QTA Design with Rental Car Agencies • RTR Cable Relocation Bid by CMAR • Estimate and Reconciliation with CMAR/RS&H • Potential RFP Selection for short term financing Next 60 days