250 likes | 393 Views
2. Agenda. AMS Assembly Area/Clean Room 867 STA
E N D
1. 1
2. 2 Agenda
3. 3 AMS Assembly Area Clean Room 867
4. 4 AMS Assembly Area Clean Room 867
5. 5 AMS Assembly Area Clean Room 867
6. 6 AMS STA Integration Hardware
7. 7 AMS Flight Integration Hardware
8. 8 Pre-integration of STAs in the Flight USS Prior to STA VC Arrival
9. 9 Pre-integration of STAs in the Flight USS Prior to STA VC Arrival
10. 10 Integration Discussion Items
14. 14 Interference between Flight VC/Magnet & Electronics Crates during Final Flight Installation
15. 15
16. 16 ECAL Main Fixation Bolts & Shims
17. 17 TRD M-Structure Shear Pins & Eccentric Bushings for STA
18. 18 TRD M-Structure Shear Pins & Eccentric Bushings for Flight
19. 19
20. 20
21. 21