An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMu Slice Test – Status & Plans Frank Geurts FNAL/Rice http://cern.ch/EmuSliceTest

  2. Objectives • Hook-up CSCs to Peripheral Crates • use final electronics, as much as possible • revert to Beam-Test solutions whenever needed • Hook up Peripheral Crates to Trigger and DAQ • use TrackFinder for self-trigger • use EMu-FED and Central-DAQ • Establish and finalize procedures and software • timing and calibration procedures • test methods (shared with 904 crew) • software integration • Prepare towards the CMS Magnet Test • Cosmic Challenge with CMS-wide slice • can we deliver a 60° sector, i.e. 39 CSCs? F.Geurts -- EMu Slice Test

  3. Spring Test Preparations “A journey of more than four hundred chambers starts with a first CSC” • Connect & Configure 6 CSCs on YE+2: • 3 ME+2 and 3 ME+3 chambers • HV + LV + gas • Self-trigger on cosmics • provide MPC data to TF • get trigger back from TTC • Provide S-Link data to Central-DAQ • and spy data to DQM • Concurrent CMS installation activities at SX5 • YE+ disk moves, cabling activities, electronics procurement • March Test pushed to early Spring F.Geurts -- EMu Slice Test

  4. 32 32 27 27 16 14 16 ME3 ME2 Current Status -1- [before disks moves] • two chambers • ME+2/1/16 • ME+3/1/16 • part of HV long term test • gas and LV are connected F.Geurts -- EMu Slice Test

  5. Current Status -2- • Peripheral Crate • “old school” • 6U backplane • standard Wiener crate • Dynatem D360 • 2 pairs of DMB/TMB • TMB2004, w/o RAT • DMB production board • CCB + MPC • DDU (temp.) F.Geurts -- EMu Slice Test

  6. Peripheral Crate “oil, grease & dust cover” dynatem D360 ME3/1/16 DDU (temp.) CCB MPC ME2/1/16 F.Geurts -- EMu Slice Test

  7. Current Status -3- • External Racks • “mini counting house” • Control & DAQ pc • remotely accessible • protected by UPS • Network power switch • allow remote power-cycling of Peripheral Crate • Pre-SpringTest location for pFED†, TF and TTC crates • awaiting rack allocation in counting house, • and fiber installation †pseudo = old DDU/CCB in peripheral mini-crate • TF crate • SBS-620 • SP • CCB’01 (spec.) • MS Rack -1- Rack -2- • TTC crate • CAEN v1718 • TTCvi • TTCvx • DAQ & Control • [emuslice01] • emuslice02 • UPS • pFED† crate • D360 • CCB’04 • DDU • FedKit F.Geurts -- EMu Slice Test

  8. Current Status -4- • SX5: Provisional Wall removal completed • Effects from dust still unclear • see next slide • Final disk movement underway • Services (gas, LV, HV) need to be re-instated • EMu Slice Test interrupted until then • DCS integration • DIM additions to PeripheralCrate library • Successfully tested (see Valeri’s presentation) • TriDAS/emu integration • see next slide F.Geurts -- EMu Slice Test

  9. “Smoke Dust Gets In Your Eyes …” ME+4/1 protection vacuum cleaning (afterwards) MPC fiber output MPC fiber output TTC fiber input (CCB) Dust in fiber connections? Repeatedly cleaned … F.Geurts -- EMu Slice Test

  10. Slice Test Software Organization • TriDAS/emu integration • Project/Package structure: emu/<package> • Standardized Makefile structures • Preparation for CMS integration (XDAQ v3) • One collection of all relevant EMU libraries: easier for XDAQ executives • PeripheralCrate first “package” • emuDCS, emuDAQ, emuDQM should follow • Sub-packages allowed • TriDAS/trigger/csctf similar efforts (Ildefons Magrans, et al.) • Uncovered nasty CVS administrative issue: make sure package names are unique throughout CVS structure. • New mailing list: EMU-SOFTWARE • Help coordinate various software efforts • Announce updates and releases F.Geurts -- EMu Slice Test

  11. Spring Test Schedule • Spring Test: 2nd half of April • Fibers installed (see next slide) • FED electronics and experts available • Timing and trigger experts available (?) • Final YE+2 location • SX5 configuration up to swiveling (Alain Hervé): F.Geurts -- EMu Slice Test

  12. Fiber Duct Installation & DAQ Room • We have asked Luit de Jong et al. to install fiber ducts for the Slice Test and Magnet Test • EMU Fibers • DAQ path = DMB-DDU + CrateController-Hub • TRG path = TTC-CCB + MPC-SP • all are multi-mode fibers with LC connectors • except for TTC-CCB: single-mode with ST connectors • From Slice Test towards Magnet Test: • 60° ME2,3 sector, i.e. 2 crates. • Patch panel will be on the YE+2 mini-rack (Trigger Sect.5) • test various patch connector options • Magnet Test • 60° ME1-4 sector, i.e. 5 crates • patch panel on YE+1 • Finalize requirements soon (i.e. during CMS week) F.Geurts -- EMu Slice Test

  13. SX5 Fiber Path for CMS-EMu -1- • horizontal distances inside SX5 only • reconsider alcove by-passes • new end positions for Slice Test by-pass this alcove? 18m Counting House (see next page) 10m 10m 15m 49m YE+2 YE+2 YE+2 20m current position magnet test slice test F.Geurts -- EMu Slice Test

  14. Fiber Patch Panels & Duct Config. excerpt from quote F.Geurts -- EMu Slice Test

  15. SX5 Fiber Path for CMS-EMu -2- • horizontal distances Counting House only • EMU racks in Rack Wizard • EMU Preference for DSS row runcontrol DAQ detectors 8m magnet 15m Counting House a.k.a. the Green Barrack S-Link Receivers Central-DAQ EMU Racks rack wizard F.Geurts -- EMu Slice Test

  16. From the Picture Book … EMU Rack Space Outdoor Cable Tray Indoor Cable Space F.Geurts -- EMu Slice Test

  17. Short term plans • Chamber timing • use test tools • with (remote) help from TMB and DMB experts • CSC trigger: configure TF + TTC • Local DAQ • Add up to 4 large chambers: • ME 2/2/31-32 and ME3/2/31-32 • Use Counting House whenever possible • Preferred location for Spring Test • fibers installation • TF, TTC and (pseudo†) FED crate in EMU racks • EMu racks were the first to be entered in the Rack Wizard †pseudo = old DDU/CCB in peripheral mini-crate F.Geurts -- EMu Slice Test

  18. 32 32 27 27 14 16 14 16 ME3 ME2 Spring Test • A 20° sector of ME2 and ME3 chambers • one peripheral crate with 6 chambers timed in • Self-trigger using TrackFinder • EMuDAQ to Central-DAQ via S-Link • all of which in the Counting House • Spring Configuration: • ME{2,3}/1/16 + ME{2,3}/2/31-32 F.Geurts -- EMu Slice Test

  19. Mid-term Plans • Replace electronics with final versions • as much as possible • CSC LV, CSC HV, Peripheral Crate Backplane, CRB (LV cooling), TMB (RAT), Crate Controller, DDU, DCC • SX5 is not a debugging area: use 904 to test electronics first • Extend number of participating chambers towards Magnet Test goals • limit to Sector 5 (corresponds to DT Sects. 10 and 11) • preference for ME2 and ME3 chambers F.Geurts -- EMu Slice Test

  20. Mid-term Plans (cont’d) • Port software libraries to XDAQ v3 • CMS-DAQ preferred software environment for Magnet Test • porting guide is now available • April 25: follow-up on EMu-Central DAQ meeting • Repeat Beam-Test style cross-system integration: • Interest from HCAL for joined test (Laza Lazic et al.) • non-critical systems integration ~May/June’05 • Strong interest from Local Trigger Controller Group (Tim Christiansen et al.) • Want us to join LTC trigger integration, ~July’05 • Potential next “Summer Test” milestone • Configuration dBase Integration • Too many chambers to keep track of F.Geurts -- EMu Slice Test

  21. Slice Test Equipment Manifest (1) Off-chamber and FED electronics F.Geurts -- EMu Slice Test

  22. Slice Test Equipment Manifest (2) Trigger and TTC electronics F.Geurts -- EMu Slice Test

  23. Schedules:EMu Slice Test and Cosmic Challenge Spring Test (DAQ) tentative Summer Test (LTC) Cosmic Challenge 6 39 EMu CSCs F.Geurts -- EMu Slice Test

  24. Cosmic Challenge • ~January 2006(!) • closure of CMS ~November 2005 • 60° sector of CSCs on ME+1, 2, 3 and 4 • 39 chambers, provided availability of off-chamber electronics • Trigger: • external and/or CSC TrackFinder • FED: • DCC read out over S-Link • central DAQ • DDU read out over spy channel • local DAQ, local DQM F.Geurts -- EMu Slice Test

  25. EMu Slice Test Web Pages F.Geurts -- EMu Slice Test