This RFQ is for the demolition of the Encina Power Station, consisting of various structures and equipment. The Chief Building Official (CBO) delegate will oversee the project on behalf of the California Energy Commission.
E N D
Siting, Transmission and Environmental Protection (STEP) DivisionPre-Bid ConferenceDelegate Chief Building Official (DCBO) Request for QualificationsEncina Power Station DemolitionRFQ-18-703 California Energy Commission, Sacramento, CA. February 5, 2019
DCBO Pre-Bid Conference Contracts, Grants, and Loans Division • Brad Worster, Commission Agreement Officer Siting, Transmission & Environmental Protection (STEP) Division • Christine Root, STEP Compliance Office Manager • Anwar Ali, Compliance Project Manager
CBO Authority / DCBO The Energy Commission is the Chief Building Official (CBO) and has the responsibility of enforcing the California Building Code. • Authority to delegate to either a local building official or an independent third party. The Delegate CBO (DCBO) represents the Energy Commission: • Engineering plan review and on-site inspections. • Energy Commission retains CBO authority including interpretation and enforcement of state and local codes.
Encina Power Station • The Encina Power Station (EPS) consists of five independent units built between 1954 and 1975. • The EPS converted to a single 400-foot exhaust stack in 1978. • The Energy Commission approved the EPS Demolition Plan in July 2015 as part of the ACECP Petition to Amend (PTA). • The PTA required the shutdown of EPS Units 1 through 5 and demolition of the EPS structures to grade.
DCBO Pre-Bid Conference • EPS Demolition (PHASE IV of ACECP) Activities Include: 1. Demolition of the following: • Power plant building and contents; • Combustion turbine and structures, east power plant building; • Ocean Water intake/discharge piping, structure and equipment; • Northwest structures, tanks, and piping;
DCBO Pre-Bid Conference • Fuel oil piping and supports; • Southeast corner structures; and • Two domestic water tanks on SDG&E property. 2. Site restoration (grading and contouring).
DCBO Pre-Bid ConferenceKey Items: • Zero Sum Contract. • Winning firm will contract directly with Project Owner for payment after completing negotiations with the Energy Commission. • Rates will be negotiated through the Energy Commission Process. • Third Party Beneficiary Agreement (Attachment 10).
DCBO Pre-Bid Conference Key evaluation criteria Minimum Requirements • Certification Regarding Conflicts of Interest. • Project Team Minimum Requirements Forms.
Minimum RequirementsCertification Regarding Conflicts of InterestCOI Form- Attachment 8
Minimum RequirementsCertification Regarding Conflicts of InterestCOI Form- Attachment 8
Minimum RequirementsProject Team Project QualificationsAttachment 11
Administrative Items Grounds for rejection • Submitting SOQ late • Missing required forms or signatures • Conflict of Interest • Anything marked “Confidential” or “Proprietary” • Submitting multiple SOQs • Unreported PIER and EPIC Royalties
ACTIVITIES AND KEY DATES * An addendum will be released if the dates change for the asterisked (*) activities.
Information Available on STEP Division Website • Amended Carlsbad Energy Center Project Commission Decision: https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docket number=07-AFC-06C 2. EncinaPower Station (EPS) Demolition Plan: https://efiling.energy.ca.gov/GetDocument.aspx?tn=20314 3&DocumentContentId=2428 3. EPS/ACECP DCBO RFQ Solicitation Files: http://www.energy.ca.gov/contracts/