200 likes | 285 Views
Tunnels. Safety. Water. Buildings. Research. ICT. Technology makes it possible!. “GREEN OFFICE 2015 ” L.J. Westerbaan Imtech Netherlands Special Market Solutions. Energy. Sustainable. Energy, Environment & CSR (Corporate Social Responsibility).
E N D
Tunnels Safety Water Buildings Research ICT Technology makes it possible! “GREEN OFFICE 2015” L.J. Westerbaan Imtech Netherlands Special Market Solutions Energy Sustainable
Energy, Environment & CSR (Corporate Social Responsibility) The technique makes it possible to live and work comfortable in an ecologically sustainable environment • Green Office 2015 • Innovative vision and integrated approach for development of durable town areas • Combination of working, living and leisure
Imtech • RAU • Ballast Nedam • Wereldhave Green Office 2015 organisation Steering committee Projectteam. Green Office 2015 RauThomas Bögl Wereldhave Norbert van Gisbergen ISSO Jaap Hogeling RGD Rene Koeslag / Gerard Wortman Aronsohn George Henkens Development team Imtech Bert Ubachs TNO Leo Hendriksen Innovatie groep UNETO-VNI Winfried Ponsioen SBR Gerben van Dijk CadVisual Joost Wijnen Swegon Air Academy Jos Hartmans Cisco Ronald Zondervan Philips Licht Floriaan Tasche TVVL Hans Besselink Ballast NedamWim Kleingeld TVVL, VUmc Energie Centrum Rob Steine PSIBouw Gerrie Mühren Stichting Bouw game Cora Gijswijt Innovation team Realisation team
Integrated Green Office 2015 design • End user • Social aspects • Ecological • Economic
Help desk Alone Security Restaurant Betty Arno Monteur Reception Inspector Software engineer Administration Local IT Fieldworker Xander Different Fixed Account manager Controlldepartment OfficeManager IT architect Carolien Legal Top ambtenaar Project manager policy employee Consultant Manager Daan policy employee Communications Cluster coordinator Processmanager Together Different people working and living together
Electric energy usage 2008 versus 2015 • OLED lightning • Well use of daylight • Low energy building installations • Additional 48 Volt low voltage circuit • User • Building
Heat consumption 2008 versus 2015 • Reduction of gas from 10 to 0
Integrated Green Office 2015 design Achieving a sustainable, affordable and reliable energy supply in our society and to reduce the environmentally harmful emissions in the use of fossil fuels.
No compromise Usage of Peltier elements for personalized treatment of the fresh air from outside
Sustainable energy within Green Office 2015 Energy demand building 65000m2 2700 MWh
Sustainable energy within Green Office 2015 • Breeam is outstanding • LEED platinum • Greencalc above 1000 • 3P above 9 • GPR above 9.6 • Energy neutral • First building made of all available C2C materials • Free of allergenic and CO2 • Own water circuit • Optimal use of day-light • Avoiding of waste, traffic and air pollution • Optimal use of existing infrastructure • Promotion of good health
Green Office 2015 results • Concrete complete proposal has been well received inThe Netherlands • Ministry, Dutch Railway, several counties are interested • Plan supported and / or adopted by many parties • VROM selected 4 sites to investigate • Alignment with the Dutch note 2040 VROM
Conclusions • Green Office 2015 Human central; well being • Green Office 2015 an energy producing area • Green Office 2015 Most sustainable in the world • Green Office 2015 prices per m2 are market prices • Green Office 2015 cities will be one again • Green Office 2015 green parcs, energy reduction • Green Office 2015 is flexible and multifunctional • Integral multifunctional approach is key