Workshop 1: Design/ Operational Margins

Workshop 1: Design/ Operational Margins. Facilitators: Rick Harris - Duke Power Bob Hess - Pacific Gas & Electric. Issues Addressed. How formal margin management program is integrated into processes What is the benefit of margin management program / model Do we need to baseline our margin?

reilly
Download Presentation

Workshop 1: Design/ Operational Margins

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop 1:Design/ Operational Margins Facilitators: Rick Harris - Duke Power Bob Hess - Pacific Gas & Electric Cleveland 2005

  2. Issues Addressed • How formal margin management program is integrated into processes • What is the benefit of margin management program / model • Do we need to baseline our margin? • Consistent definition of design vs operational margin • Criteria for evaluation & prioritizing margin Cleveland 2005

  3. Margin Management Integration into Processes • Existing programs address margin • Use margin as part of Plant Health Committee • Margin Review Board • Top Ten lists include margin issues Cleveland 2005

  4. Margin Management Integration into Processes (cont.) • Address margin in calcs, mods & system health reports • Use questionnaire to solicit margin issues Cleveland 2005

  5. Benefit of Program • Margin Management is what engineering is about - difference is documenting it • Power Uprates have pointed out margin issues • Instills Safety Culture in Organization Cleveland 2005

  6. Benefit of Program (cont.) • Puts issues in front of decision makers & facilitates communication • Raises awareness • Highlights where actions are needed & encourages action • Prevent consuming margin inadvertently Cleveland 2005

  7. Do We Need to Baseline? • Evaluate your accumulated experience • Treat as assessment • Baseline areas that show adverse trend • Use as-needed • Develop tools to track issues but not all margins Cleveland 2005

  8. Consistent Definition of Design vs Operational Margin • INPO developing training module • Brief discussion in AP 929 Cleveland 2005

  9. Criteria for Evaluation & Prioritizing Margin • Include in Health Report • Plant Health Committee prioritizes with other issues • Assign points in existing prioritization scheme • Evaluation based on risk • Evaluated case-by-case Cleveland 2005