Status Report on Data Reconstruction May 2002 C.Bloise

Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production Monte Carlo samples Data taking in Y2002 Summary. Y2001 Data. Study of the data samples taken at different background levels

Download Presentation

Status Report on Data Reconstruction May 2002 C.Bloise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production Monte Carlo samples Data taking in Y2002 Summary

  2. Y2001 Data • Study of the data samples taken at different background levels • Reconstruction improved : more robust selection criteria implemented

  3. Data ReconstructionUpdates • Filtering Procedure • Pre-filtering of cosmic muons removed • Rejection of events with a big number of calorimeter cells removed • Selection criteria • Large angle bhabha and gg selection improved • Tag devoted to kSp0p-p+ , kLgg, kLp0p0 added • Charged kaon selection criteria completely revised • Calorimeter Calibration • Refined time calibration introduced on Oct, 17th • Procedure to correct the rest of data created

  4. Reconstruction - Y2001 cos raw DC recon. Evt. Class bha prescaled cosmic kpm ÷10 ksl EmC recon. MB cosmic Bhahba DC recon. Evt. Class rpi rad clb ÷100 flt afl

  5. Reconstruction - Y2002 L2 Triggers L3 filter cosmic bha kpm raw ksl EmC recon. MB cosmic DC recon. Evt. Class rpi rad clb ÷100 flt afl

  6. Data Reprocessing To generate an homogeneous data set on respect filtering criteria and calibration quality to include the new selection criteria developed for charged and neutral kaons for improving the luminosity measurement. Reprocessing from January, till May, with 17 109 triggers analyzed

  7. Computing & Data Storage 2002 1.4 TByte Online farm fibm04 .... fibm08 Reconstruction output 560 GB Job control areas 200 GB Recalled Data from Tape 2200 GB krunc Run Control & DFC fibm01 DB2 Server 2 IBM H80 TSM/NFS Servers Offline farm 22 IBM B80 88 CPU 2.7 KHz : total farm power 10 Enterprise 450 40 CPU MonteCarlo DSTs 2 IBM + 2 Sun Users Magstar 5,500 Cassettes 12 Tape Units 220TB Catalyst 6000 2 IBM H70 AFS Servers 2 TByte

  8. Day by day Data Reprocessing pb-1/day KHz pb-1/100Mtri Feb,17th May, 7th

  9. Data Taking in Y2001 180 pb-1 collected in different run periods, at different luminosities and background levels Different run conditions imply different CPU power needed per pb-1 different data volumes stored per pb- 1 Y2000 and Y2001 Data set - CPU power cost and data volumes stored for different data taking conditions

  10. DSTs for the analyses Besides the reconstructed data sample, the DSTs are produced, with a selected information content reducing by a factor of 10 the data volume for the analyses. These files are created immediately after the data reconstruction completion to take advantage of the availability of the files on disk. Excluding the charged kaon DSTs, that have not been created so far, we have a total of 6 GB/pb-1 as DST volume. The charged kaon DSTs will have both, the biggest event size, and the largest event sample: 106 events/pb-1X 5 KBytes/event, e.g. 5 GBytes/ pb-1 1.4 TBytes of disk space devoted now to DSTs on the new servers. To allow an efficient multi-user access to the entire DST sample (6 TBytes by the end of data taking) we need to increase disk space to 4 Tbytes by the end fo the year

  11. Monte Carlo • 8 Sun-Enterprise 450 are dedicated to Monte Carlo generation and reconstruction • Event production is based on procedures based on the information (random seeds, input cards, job status ,…) in the DB • Computer power correspond to 2.5  4 106 events completed per day • The most demanding task is the study of the background topologies • Work in progress • 44 106 of Ks  p+p- decays (60 pb-1) ~25% available • 12 106 of F decays ( 5 pb-1) ~50% available

  12. Y2002 Data Reconstruction The Offline farm can process 2,700 triggers/s Y2002 Data : May 3rd – May 17th : Trigger rate 1.5 KHz (Level 3) 0.04 nb-1 s-1 300 F & Bhabha s -1 1200 Bck s-1 40% of the farm available for users and DST production Enough power is left for handling further improvements in the luminosity.

  13. Day by day 2002 Data Reconstruction pb-1/day pb-1/100Mtri KHz May, 3rd May, 17th

  14. Data taking conditions May 2002 From 8 pb-1 of integrated luminosity Y2000-Y2001 data fill about 105 Tbytes, e.g. 2650 cassettes, corresponding to 54% of the Tape Library storage space. Total capacity of the Library, inclusive of the Y2001 data set, and assuming the present DaFne running conditions, is 400 pb-1 corresponding to 100 full days of data taking, and if we scratch the filtered sample, is 570 pb-1 corresponding to 177 full days of data taking.

  15. SUMMARY Disk space : Multi-user access to DSTs (6 Tbytes expected by the end of the year ) requires additional 3 Tbytes by the end of the year. Library : It will be full by the end of the year. As soon as they will be available on the market (Summer 02), and according to the data taking status we expect to update the tape drives to increase the total capacity by 50% New storage solutions are under study for the year 2003 data taking. Computing Power : Less than 50% of the approved total computing power has been acquired so far. It is enough for the online reconstruction, DST production, to generate MonteCarlo samples and to perform the ongoing analyses It is marginal for any reprocessing campaign, as the 4-full-months needed to reconstruct 180 pb-1 demonstrate.