Schedulers Conference Portland Oregon May 14/15, 2014 Marketing Perspective 15 Minute Scheduling

Schedulers Conference Portland Oregon May 14/15, 2014 Marketing Perspective 15 Minute Scheduling. Demetrios Fotiou. DISCLAIMER.

reuben
Download Presentation

Schedulers Conference Portland Oregon May 14/15, 2014 Marketing Perspective 15 Minute Scheduling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedulers ConferencePortland OregonMay 14/15, 2014Marketing Perspective 15 Minute Scheduling Demetrios Fotiou

  2. DISCLAIMER • The views expressed in this presentation are those of the presenter and do not necessarily reflect the views of Powerex Corp., its employees or directors. It is a presentation for the purpose of discussion, to express observations and to provoke discussion. Some of the information was submitted to me, I did not check its accuracy. Take this presentation for what it is worth, a bunch of slides, a bunch of information, and some interpretations of that information and some historical perspective.

  3. Top 10 Country Songs You Are Forced to Listen To On Long Drives To Conferences • 10) At the Gas Station of Love, I Got the Self Service Pump • 9) You're The Reason Our Kids Are So Ugly • 8) Here's A Quarter (Call Someone Who Cares) • 7) How Can I Miss You if You Won't Go Away? • 6) I Fell for Her, She Fell for Him, and He Fell for Me • 5) I Only Miss You On The Days That End In " Y “ • 4) If I Had Shot You When I Wanted To, I'd Be Out By Now • 3) If You Can't Live Without Me, Why Aren't You Dead? • 2) Last Night I Went to Bed with a "10" and Woke this Morning with a "2“ • 2) My Wife Ran Off With My Best Friend, And I Sure Do Miss Him • AND STILL NUMBER ONE • 1) Get Your Tongue Out Of My Mouth, Because I'm Kissing You Goodbye

  4. History (Preschedule – NW Focus) • Prior to 23 years ago • Custom deals between operations staff • Approximately 17-23 years ago • WSPP • Dedicated traders • Bilat, telephone • Larger Volume and custom trade volumes (i.e. 300 or 86) • Simple scheduling • Approximately 12-17 years ago • Volumes started to trend to 25/50/100 pieces • Electronic trading started to develop • Brokers came into the scene • Etags

  5. History (Realtime - NW Focus) • Prior to17 years ago • Dispatcher to Dispatcher, Neighbour to Neighbor • High quantity, low volume, usually multiple hour deals • Some system Parking with return at later date • Most entities planned to meet their own peak load with no help (systems were over-built) • Approximately 17 years ago • organized Realtime Markets with separate RealtimeTraders • Realtime market was competitive, virtually everyone was long • December 1, 2009 • BPA began allowing “limited” intra-hour schedules with restrictions (export only, treated as NF, new etags only, existing tx) • July 1, 2011 • BPA allows full 30 minute access, restrictions lifted • Full intra-hour (30 min) access since

  6. 30 Minute (Intra Hour) Scheduling • There are currently no restrictions preventing 30 minute scheduling • Approximately 0.4% of etags are intra-hour etags (NW) • Approximately 0.01% of etaggedMWHr volume is intra-hour (NW) • The vast majority of energy trading in the NW is still single or multiple hour blocks of energy

  7. Potential Factors for Low Intra-Hour Volumes • Time requirement / Impact to existing business? • If not busy, definitely entertain added business, considering factors below • If busy, definitely need to consider the factors below • When do we receive requests for intra-hour service? • Calls come in typically near top of the hour • This gives you only about 5-15 minutes (peak time for hourly) • In comparison hourly deals typically give you 30-40 minutes notice • Transmission Costs double (need to purchase full hour to use 30 mins) • Quantity is half (40MW for 30 mins= 20MWHrs) • Ramped in at double the ramp rate (10min vs 20min) • For 50MWHrs (100MW - 30 min sched), ramp is equal to 200MW • Additional unit wear and tear • Need to do additional planning for system

  8. Operationally – What is going on? • Units might need to go to/from S/C • Units might need to turn on/off • Units might need to be ramped up/down • Increased wear and tear • Result is increased maintenance costs • Result is more frequent maintenance • More frequent maintenance, means more unit down time • Communications with system person • Need to communicate regarding all of the above • This takes additional time, communication and approval • Hourly deals are core business, system is planned this way • If volumes were higher, planning and communication would adapt

  9. Operations – Flat Loads

  10. Operations - Ramps

  11. Potential Factors for Low Intra-Hour Volume Continued • Catch 22 • Low volume deal, is it economic for impact? • High volume deal, need to consider operational impacts • Both end up (usually) requiring higher price than hourly price • Harder to agree on price • Hourly Price is not indicative of costs and impacts • Adder can be small or large depending on system and workload • It never hurts to ask

  12. Additional Intangibles to Consider • Automation • We have upgraded many systems, including our trading system down to a 1 minute resolution • Automation cannot currently be 100%, there needs to be some human actions taken • Still takes time, similar to 17 years ago • Many systems to consider (billing, settlements, operations, etc..) • Updating Software • How do you recover cost? • It takes time to update all impacted systems • Increased volume would help justify expediting work • Firm Bumping rights within the hour

  13. 15 Minute Market(What I Was Supposed to Talk About) • Impacts of 30 minute scheduling basically double for 15 minute schedules • A 100MW deal is only 25MWHrs • For a 25MWHr schedule, you ramp equal to 200MW hourly schedule (8 times higher than MWHr quantity) • Transmission paid for full hour (4 times hourly cost / only use portion) • Cost of service will usually be even higher (depends on conditions) • BPA not ready until October, preventing most NW participants access • CISO FMM • Can change bid/offer to reflect system limitations (i.e. ramping)

  14. Questions / Comments / Discussion