Innovative fuel quality control process for recycled wood

Innovative fuel quality control process for recycled wood. Mark Christensen MSc 07876 640 786 markc@reliagen.co.uk. Approx 4.1 million tpa of waste wood in UK ( Poyry , 2010) with historic variation of 4.5 to 10.6 mtpa .

reyna
Download Presentation

Innovative fuel quality control process for recycled wood

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Innovative fuel quality control process for recycled wood Mark Christensen MSc 07876 640 786 markc@reliagen.co.uk
  2. Approx 4.1 million tpaof waste wood in UK (Poyry, 2010) with historic variation of 4.5 to 10.6 mtpa. Sources: construction (25%), demolition (26%), packaging (27%), joinery/furniture (9%) and municipal (13%). Some unaccounted until the market values it. Gate fees: Grade A @ £2/ to £15/t , Grade C @ £19/t and £33/t (ESA, 2008 to 2012). Virgin biomass woodchip selling for ca.£85-100/t to RHI operators, compared to existing Grade A at £30-60/t and Grade B/C at £10/t (once processed). Technological solution needed to ensure quality , scientific, technical evidence (End-of-Waste status). Biomass sustainability criteria (EU Regs) not applicable to wastes, so avoids virgin biomass PR risk. The Market:
  3. Automatic sorting of recycled wood grades Quality control to purities >90% and into Grades Overcomes industry regulatory constraints Avoids pitfalls of current practices Adapts and combines innovations Unparalleled process spec with Patent Pending. Modular and replicable business model Refinance opportunity for quick / partial exit Deliverable in ca. 4-6 months, target urban areas The most sustainable and Carbon efficient fuel The Solution:
  4. Strategic location to RHI end markets with good access. Wales has ca. 180ktpa (mainly urban) of waste wood. 45ktpa capacity (25%) with plus Bristol & Birmingham. Revenues from allmetals extraction and two grades of biomass fuels via highly energy efficient process. Avoids costs of fines (<10mm) and cleaned up for end markets with less Regulatory risks with EA. Long established partner companies for process design & install. Core team of 5 highly experienced, plus 3 NEDs. Roll-out plan of 5 sites within 3 years, prior to sale. Option to expand site(s) into CHP, virgin wood processing, bio-oils, pellet production (£150-200/t). Project Summary:
  5. Site with Planning – freehold or leasehold option. Contractors for supply and off-take at Heads of Terms. £2.2m of capital needed for process, working capital, fees. £100k of SEIS to take to financial close (legals, etc). WAG funding potential for <50% of capex & Finance Wales. WRAP eQuip underwriting for asset finance (ca. 30%). BPRA Tax Relief if freehold taken (£3m), subject to details. EIS potential for <£5m capital project, application drafted. Project IRRs >18% (20 yrs) with refinancing upside. EBITDA at ca.£800k p.a. after year 3 (>35% gross margins) Ca.£2m T/O p.a. with issue ca.£400k of dividends p.a. Equity funding requirement of £1m for majority stake. The Financials: